Presentation is loading. Please wait.

Presentation is loading. Please wait.

Announcements Review on Thurs Project 4 Extra office hour: Friday 4-5

Similar presentations


Presentation on theme: "Announcements Review on Thurs Project 4 Extra office hour: Friday 4-5"— Presentation transcript:

1 Announcements Review on Thurs Project 4 Extra office hour: Friday 4-5
due Wed night no later than Friday night (with late days) Extra office hour: Friday 4-5

2 Photograph Photograph

3 Virtual Camera Morphed View

4 View Interpolation Problem Statement
Input: two views of an unknown rigid scene from unknown viewpoints Output: in-between views from a virtual camera

5 Image Morphing Photograph Photograph Photograph Morphed Image
Linear Interpolation of 2D shape and color

6 Image Morphing for View Synthesis?
We want physically-correct view interpolations Can image morphing do this? Not quite... Goal: extend to handle changes in viewpoint Produce valid camera transitions

7 Special Case: Parallel Cameras
Left Image Morphed Image Right Image Morphing parallel views new parallel views Linear image motion linear camera motion Works because projection matrices have a special form

8 View Morphing in 3 Steps Input Output Input

9 View Morphing in 3 Steps 1. Prewarp align views

10 View Morphing in 3 Steps 1. Prewarp align views 2. Morph move camera

11 View Morphing in 3 Steps 1. Prewarp 2. Morph 3. Postwarp align views
move camera 3. Postwarp point camera

12 Corrected Photographs
Face Recognition Corrected Photographs

13 Videos View morphing Blanz & Vetter (SIGGRAPH 99)
MIT single view (SIGGRAPH 01) Yu inv-radiosity (SIGGRAPH 00) Debevec relight (SIGGRAPH 02) Video rewrite (SIGGRAPH 97) Vision-based pong (Seitz tape) Debevec IBMR in art & cinema tape Debevec face relighting demo


Download ppt "Announcements Review on Thurs Project 4 Extra office hour: Friday 4-5"

Similar presentations


Ads by Google