PROJECT METEOR OXIDIZER SYSTEM AND STRUCTURE
PROJECT REVIEW Friday November 9, 2007 MAGGIE ANDERSON NATHAN CONFER TONY NIMEH TIM SEIBERT CHRIS WERGIN 1/1/2019
2
CONTENTS METEOR Overview Hybrid Background Team Organization
Constraints/Risks Deliverables Specifications List Hybrid Rocket Concept Strategy Detail Design Overall Hybrid Rocket Structure and O.D.S Structure Oxidizer Tank Oxidizer Delivery System SDII Project Plan Questions/Discussion *Please feel free to ask questions or make comments during the presentation* 1/1/2019
3
Introductions Tim Seibert Maggie Anderson Chris Wergin Tony Nimeh
Nathan Confer Tim Seibert Maggie Anderson Chris Wergin Tony Nimeh 1/1/2019
4
Project METEOR strives to create a lower-cost
Project Background Project METEOR strives to create a lower-cost alternative to current low-Earth orbit launch solutions for "Picosatellites", a class of satellites weighing approximately 1 kg. The purpose of the Rocket Integration Team is to accept the hybrid engine while incorporating the remainder of the major rocket subsystems. 1/1/2019
5
Project Overview 1/1/2019
6
Benchmarking and Brainstorming
Chalice Design Embedded Design After investigating the previous team’s work and looking into other hybrid rocket designs it became obvious that the project has three major components. These components are the frame, the tank, and the oxidizer delivery system. 1/1/2019
7
Team Organization Project Manager Technical Lead Frame Oxidizer Tank
Nathan Confer Technical Lead Tony Nimeh Tank Design -sizing dimensions -material considerations Manufacturing -composite capabilities Frame Tony Nimeh (focal) Tim Seibert Super Structure -assembly rods -support plates Oxidizer Tank Chris Wergin (focal) Tony Nimeh Delivery System Maggie Anderson (focal) Nathan Confer Components -piping -valves Safety -burst prevention -pressure regulators 1/1/2019
8
Hybrid Rocket Concept 1/1/2019
9
From Concept to Reality… Engineering the Future
Tank Design 1/1/2019
10
Oxidizer Tank 1/1/2019
11
N20 Pressurization Oxidizer Tank Single-tank configuration with Helium gas used to pressurize the liquid nitrous oxide. Goal: Deliver 1500 psi to injector plate Helium (gas) Nitrous Oxide (liquid) 1/1/2019
12
MATLAB Program Results – End Pressure Tank Volume
1/1/2019
13
MATLAB Program Results – End Pressure Initial Temperature
1/1/2019
14
MATLAB Tank Evacuation Solution
1/1/2019
15
Final Oxidizer Sizing Prefab composite Tank produced by SCI composites
Aluminum liner with carbon/glass reinforcement 1212 cubic inch volume 3259psi rated service pressure Pressure tested to 5000psi 18.7lbs empty weight Tank already purchased by P07109 1/1/2019
16
From Concept to Reality… Engineering the Future
Oxidizer Delivery System 1/1/2019
17
Oxidizer Delivery System
1/1/2019
18
Head Loss Calculations
Velocity: Mass Flow Rate: 1/1/2019
19
Head Loss Values Component Description Head Loss (in) A N2O Tank 0.00
1 N2O Tank Connection Port 16.48 2 N2O tank Fitting 0.19 3 Cross Fitting 73.36 4 Connection Nipple 0.06 5 Remote Ball Valve 1.39 6 7 Pressure Regulator / Flow Switch 0.28 8 9 Flexible Hose + Connectors 5.61 10 11 Check Valve 244.23 12 13 14 15 Injector Plate Connection Port 0.05 B Injector Plate TOTAL 415 1/1/2019
20
Feed System: Part Selection
Aaaaaaaahhhhhhhhhhhh that’s a lot of money! With a regulator in there, I just spent about 4/5 of our budget! Well, at least the feed system will be pretty sweet. 1/1/2019
21
Feed System: Part Details
Relief Valve Desired range: psi Proof pressure: 4500 psi Stainless steel construction ½” Pipe Size 250°F max temperature ~$450 each 1/1/2019
22
Feed System: Part Details
Ball Valve 316 Stainless Steel ball 17-4 PH SS stem Delrin seats PTFE body seals & packing ½” Pipe Size 4500 psi max at 120°F $ each Check Valve 303 Stainless Steel 440 SS ball 5000 psi max at 400°F $86.40 1/1/2019
23
Feed System: Part Details
Metal Hose and JIC Swivel Female Fittings T361L SS heavy-weight hose T321 SS double braid 1500°F max temperature ½” Pipe Size Minimum length for vibration = 6 in 1/1/2019
24
Feed System: Part Details
Circle Seal Pressure Regulator 303 Stainless Steel body Orifice = 0.145” Cv = 0.37 Inlet/Outlet: psig 160°F max temp ~$2000 (approximation based on P07105 Emerson Quote) 1/1/2019
25
1/1/2019
26
From Concept to Reality… Engineering the Future
Structure 1/1/2019
27
Structure 1/1/2019
28
Rods Rings Structural Skeleton
Continuous-length distributes thrust and weight Lightweight & strong Excess length for future add-ons Rings Anchored to rods Spaced so as to avoid buckling Chamfered in order to support tank 1/1/2019
29
Structural Skeleton Rod analysis
Worst-Case (Axial Stress): Vert. Test Stand Fixed at top, Axial load Worst-Case (Bending Stress): Balloon Ascent TBD depending on carriage 1/1/2019
30
Sourcing Rods Structural Skeleton Online Metal Store – round bar stock
Grade 5 more difficult to machine than 2 1/1/2019
31
Sourcing Rings Structural Skeleton
McMaster-Carr – Aluminum plate stock 6061 Al is reasonable to machine in-house 1/1/2019
32
Senior Design II Outlook
Review finalized design, milestones, and lessons learned from SDI Establish part delivery dates Resolve any shipping delays or unexpected setbacks during transition from SDI to SDII Finalize manufacturing schedule Setup manufacturing and assembly completion date(s) Correlate with P08105 for date to assemble entire rocket (tank with engine) Test entire rocket assembly Write up design, manufacturing, and testing, reports and conclusions (and poster) 1/1/2019
33
questions comments concerns