EVLA Monitor & Control System
Status, Interaction With Correlator, Schedule Bill Sahr Correlator face-to-face 31Oct2006 – 01Nov2006
2
EVLA M&C Transition System
2
3
Prototype Correlator Questions Dates
What are the (current) dates for: Installation of the PTC at the VLA Site? DRAO’s OTS Testing at the VLA site? Based on communications with Amy & Brent, as of 9/1/2006 the working dates were: Prototype Correlator Installation: 02-29Jan2008 OTS Testing: 30Jan-13May2008 However, these dates assumed a delivery date of end- Sept 2006 for the Baseline Board & end-Oct 2006 for the Station Board. Bill Sahr Correlator face-to-face 31Oct2006 – 01Nov2006
4
Prototype Correlator Data Flows
4
5
PTC Data Flow – EVLA M&C Connection
5
6
PTC – Configuration, Monitor, Control
6
7
Station Board Data Products
7
8
Baseline Board Data products
8
9
Correlator Backend (CBE) & Fast Formatter (FF)
9
10
Data Capture & Format - IDCAF2
10
11
Post Processing 11