1 EVLA Monitor & Control System
Status, Interaction With Correlator, Schedule Bill Sahr Correlator face-to-face 31Oct2006 – 01Nov2006

2 EVLA M&C Transition System
2

3 Prototype Correlator Questions Dates
What are the (current) dates for: Installation of the PTC at the VLA Site? DRAO’s OTS Testing at the VLA site? Based on communications with Amy & Brent, as of 9/1/2006 the working dates were: Prototype Correlator Installation: 02-29Jan2008 OTS Testing: 30Jan-13May2008 However, these dates assumed a delivery date of end- Sept 2006 for the Baseline Board & end-Oct 2006 for the Station Board. Bill Sahr Correlator face-to-face 31Oct2006 – 01Nov2006

4 Prototype Correlator Data Flows
4

5 PTC Data Flow – EVLA M&C Connection
5

6 PTC – Configuration, Monitor, Control
6

7 Station Board Data Products
7

8 Baseline Board Data products
8

9 Correlator Backend (CBE) & Fast Formatter (FF)
9

10 Data Capture & Format - IDCAF2
10

11 Post Processing 11