Presentation is loading. Please wait.

Presentation is loading. Please wait.

LSST Camera Internal Review

Similar presentations


Presentation on theme: "LSST Camera Internal Review"— Presentation transcript:

1 LSST Camera Internal Review
October 14, 2008 SLAC Kirk Gilmore Roger Smith Cal Tech Reviewer

2 Emergency Information
Fire Evacuate. Be aware of building exits Follow building residents to the assembly area. Do not leave till you are accounted for, and have been instructed to. Earthquake Remain in building: Duck, cover, and hold position When shaking stops: Evacuate building via a safe route to the assembly area Introductions Review length of class Breaks There will be a test Questions

3 Coordinating the NSF and DOE Support
DOE follows: Program and Project Management for the Acquisition of Capital Assets,” DOE Order 413.3 NSF follows new policy modeled in-part after DOE model: “Guideline for Planning and Managing the Major Research Equipment and Facilities Construction Account,” November 22, 2005 NSF DOE

4 Roger Smith – Cal Tech, Reviewer
LSST Camera Review Roger Smith – Cal Tech, Reviewer Start 8:00am – Kavli 2nd Floor Conference Room call-in: # Intro and charge – 10 min – KG Overview of the camera – 20 min – KG 3A. Filter status report – 15 min – KG 3B. Detector Status Report – 10 min – KG Electronics – 60 min - Oliver (Harvard) Break – 10 min - Finished here by 10:15am Camera Controls/Data Acquisition – 15 min – Schalk(UCSC) Cryostat – 60 min - Schindler Corner Raft – 60 min – Olivier (LLNL) Lunch – 45 min (12:30pm to 1:15pm) Utilities – 30 min - Nordby Integration and Test – 60 Min – Nordby (SLAC) Break – 10 min Calibration – 60 min – Burke (SLAC) Delivered image quality budget – 10m - KG Metrology – 30 min – Rasmussen (SLAC) Close-out/Q&A – 60 min – Don Sweeney and Roger Smith to lead Finished at 5:30pm


Download ppt "LSST Camera Internal Review"

Similar presentations


Ads by Google