1 Post-PCB Submission Progress Briefing
Daryl Sielaff Ben McQuiston Will McKenna David Hartman

2 Major Modules Boot up Software / Memory Mapping
LCD Initialization / Menu logic USB controller code Note Finding Software IMS –> MIDI converter Playing MIDI files

3 Timeline October 19: All Parts in Hand for PCB Matching
October 20: Final PCB Turn-in November 1 3: All Software Prototyped November 8 10: Get DSMRP Responsive / PCB Populated November 21: Individual PSSCs Working December 6: PSSCs Successfully Integrated December 11: All Team HWs Completed.

4 PCB Progress Issues: Regulator output did not match what was expected of the outputs. Solder mask placed over copper pour heat-sink/ ground connection. Trace not connected to Copper pour (1.2v) on DSP chip Not Cool !!

5 PCB Progress Issues (Cont.)- Things to add External Flash chip
CS pin for LCD will change as a result No Footprint for Ext. Flash Chip Boot configuration pins need changing Change reset circuitry (Add Cap)

6 PCB Progress Current Actions: Probing board for correct connections
Wiring power portions of board Current state of population