Download presentation
Presentation is loading. Please wait.
Published byDenisse Osmer Modified over 10 years ago
1
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER
2
Actual situation
3
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation
4
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation
5
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation
6
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Actual situation
7
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Projected situation
8
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER
9
Repairing refers to: The basketball field, where it is planed to repair the damaged baskets, mark the ground and repair the existing urban furniture. The field for combined sports, where it is planed to level the ground adequately, repair the baskets, install the goals, mark the ground and repair the existing urban furniture. Since there is a basketball field nearby, intervention implies the reduction of the basket standard height to enable younger children to play this sport. The surfaces of the existing pedestrian paths. Surfaces for the vehicles parking and their adjustment to the needs of persons with disabilities (at least a few parking spaces near the field, that is, the access to pedestrian paths).
10
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER
11
The surface this equipment is located on is planed to be covered by Ecoflex, the material resistant to different weather conditions, which is not slippery and has a certain level of flexibility which prevents injuries. Ecoflex is planed to be dark gray with the white lines drawn on it. The surface between the handrails on the ramp and the walking and playing area with handrails is colored, enabling the children with sight impairment to be better oriented in the space. A color is also planed in one part of the pedestrian path, going through a fencing part of the playground, leading to the area for the children to play. It is planed for part of the ground to be covered by sand and for the slide exit and the playing tables to be projected on this area.
12
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER
15
Reconstruction refers to: The children playground area, implying the construction of the new spaceship-like installation - system for the children to play outside. This solution is anticipated because this type of the installation is very interesting, especially to children, encouraging their imagination. The installation is also accessible to the persons with physical disabilities (wheelchair users) over a ramp which is the only way to reach the installation (in this way the children wouldnt be separated). As far as the equipment within the children playground is concerned, there are: swings, with three places for swinging, with specially projected sits, the area for playing and for walking with handrails and a slide within the installation. The surface this equipment is located on is planed to be covered by.
16
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities
17
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities
18
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities
19
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER Playground equipment suitable for children with/without disabilities
20
IDEA SOLUTION FOR PLAYGROUND IN NORWAY STREET, BEŽANIJSKA KOSA QUARTER
22
The Project anticipates fencing one part of the area for its maintenance and protection. One part of the fence would be a 2m wall in the part of the area looking towards the large traffic artery and Bezanija graveyard. In addition to this the solid obstacles would be followed bu reinforced police protection, especially at night. The additional funds for fence will be made bu ISDC from other donators, as National Investment Plan, Municipality, etc. Final look of the park
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.