Engr 1202 ECE Project Cost Analysis
10
Two Categories of Business Expenses
Direct (Manufacturing Cost) Material Cost Factory Cost Labor Cost Indirect Sales/Marketing Staff Phones Insurance Advertising Travel Lawyers Accounting Benefits
11
Cost Analysis for Engr 1202 ECE Project
For purposes of the Engr 1202 ECE project, we will deal only with direct costs. Final cost is ALWAYS important Direct costs will include tooling, labor, materials, and losses during manufacturing (Yields) Lowest cost with highest quality is the goal Market will determine success, not technology innovation
12
The cost analysis will be done using the Excel software
Excel is a spreadsheet program Excel provides a simple way to do arithmetic calculations and value changes to get final calculations Changes to any value ripple through the entire spreadsheet to adjust final answers Once the spreadsheet is set up, it can be used over and over (for different years, months, semesters, etc.) Excel is good for check book balancing, budgets, stock portfolio history, financial assets, grading for classes, etc.
13
Sample grading spreadsheet
Final Grade 85(.2) + 86(.4) + 90 (.2) + 80 (.2) = 85 “B”
14
List processing steps used
15
Determine maximum lot size – the maximum number of wafers that can be processed at once
16
Determine tooling cost for each process
17
Determine tooling hours per process step
18
Total tooling cost is calculated
Tooling cost/hour x Tooling Hours = Total Tooling Cost Sum of each process
19
Choose a labor cost per hour
20
Determine labor hours per process step
Note - labor hours will be different from tooling hours. Labor can be used for other tasks while parts are being processed in the tool
21
Total Labor Cost is calculated
22
Tooling plus Labor cost are added
23
Manufacturing cost per wafer is calculated
Manufacturing cost = cost per step / lot size
24
Approximate Wafer cost
Cost is now per wafer Approximate Wafer cost 4” - $10 6” - $24 8” - $75 12” - $150 Find your conductor cost per gram on the conductor attributes chart on the web site Note- Use of larger wafers would require higher tooling cost due to the tooling being much more expensive Manufacturing cost per wafer + material costs
25
Wafer losses are factored in
One wafer in 10 gets broken Finished wafer cost x wafer yield = yielded wafer cost
26
Final manufacturing cost of one antenna is calculated
Yielded wafer cost is divided by yielded total number of complete antenna on wafer to give individual antenna cost
27
Title must be added to spreadsheet
29
Assignment – HW 11 due next class
Each student is to create a manufacturing cost spreadsheet for your antenna design – due next week Count or calculate number of complete antenna on a 4” wafer Each spreadsheet must have a title with the team number and the individual student name Spreadsheet must have gridlines Spreadsheet must fit on one page Each team must assign one of the listed options to each student Labor at $ 0.00 Labor at $ 10.00 Labor at $ 50.00 Labor at $ or any labor cost over $100 All equipment tooling cost at $150/hour Wafer size at 6” – multiply antenna quantity for 4” wafer by scale factor Use wafer cost of $24 for 6” wafer Wafer size at 12”, multiply antenna quantity by 4” wafer by scale factor Use wafer cost of $150 for 12” wafer Determine the labor cost you will use for your presentation/report Evaluate if cost is reasonable Redesign to improve cost if necessary