Magnet PS Controls Hardware Status
BYKIK Pulser Under construction Installation - May 10th in b005 Procurements Order - Done Delivery Intermediates – on schedule, b5 ps have arrived. MCOR - arrived MCOR Bulks – arrived PLC’s – arrived, awaiting BYKIK plc. VME I/O and CPUs - Arrived Drawings – Done Cable Plant – Done Racks Populated in b24 high bay Awaiting VME and intermediate PS installation
2
Magnet Controls Software Status
1/2/2019 Magnet Controls Software Status EPICS software – use injector/bc1/bc2 drivers and device support sequences EPICS Databases - 1 month BSY, LTU, Undulator and Dump Configuration Files - 1 month SCORE ChannelWatcher ChannelArchiver EDM Displays – 1 month Magnet Power Supply API published for physicist usage – done (upgrade) System Integration BYKIK – May 2008 Sept - Oct 2008
3
Installation Schedule
4
Magnet Racks Field test 6 new Intermediate and 96 new MCOR systems
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.