Operations and Maintenance
Algae Wading in the Plaza de Fundación General Update
3
Algae Staff have been mechanically removing the algae on a daily basis from the creek. WPO staff have met on site with consultants who have various strategies to manage algae in the creek
6
Algae Solutions/Products
Short Term Solution Immediate visual results-initial treatment will be with hydrogen peroxide then transition to algaecide if needed. TPWD permit has been acquired Long Term Products that will provide good bacteria to the water and naturally combat various nutrients-phosphorous, etc. Biochar Water Cleanser Aquatic vegetation maturity and continued management of off site storm water will assist in algae management
7
Plaza de Fundación
8
General Update Continuation of ongoing O&M
Litter removal Pressure wash of the paseos Cleaning of the art murals To date- minimal graffiti abatement Centro services - 6am-8pm seven day per week. Operational presence at 836 Laredo St.