Download presentation
Presentation is loading. Please wait.
1
UVIS TEAM MEETING OPERATIONS UPDATE
01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
2
UVIS TEAM MEETING OPERATIONS UPDATE
Instrument Status On/Off Cycle: 29. No change Hours On: ~116,500 hours. Longest continuous operations: 9/11/2007 – 11/1/2010 HDAC Filament Modulation: Filament 1: 308 hours (H cell), 148 hours (D cell). Filament 2: 12 hours both H cell and D cell. Last: In S82 during T97 (H cell). Next: In S82 during T98 (H cell). In S83 during T100 and T101 (H cell) 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
3
Significant Data Issues
UVIS_191SA_SREGMOVI001_VIMS DSN problem. Data good after 158T21:41:03 UVIS_194SW_IPHSURVEY012_RIDER UVIS_194SA_EUVFUV002_PRIME DSN problem. 5 steps lost out of 46 steps S80 UVIS_197SW_IPHSURVEY014_RIDER UVIS_197RI_FMOVIE002_ISS Heavy rain. Data good after 258T14:26:30 S81 UVIS_199RI_SPOKEMOV002_ISS DSN problem. Data missing from 315T05:05:00 to 315T12:10 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
4
UVIS TEAM MEETING OPERATIONS UPDATE
First Time Events Not really a first time event: SteFFl calibration UVIS_196IC_SPICARAST001_PRIME (2013/230) also includes a regular calibration Also includes an HDAC FOV scan along the X-axis (rotation around Z) 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
5
UVIS TEAM MEETING OPERATIONS UPDATE
Rbot: Workload Impact The impact of Rbot on the ops team workload has been VERY light: S81: 0 out of 1 design S82: 0 out of 8 designs S83: 0 out of 25 designs 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
6
UVIS TEAM MEETING OPERATIONS UPDATE
Major Local Issues Uplink side: None Downlink side: None 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
7
S78 Data Utilization Summary
01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
8
S79 Data Utilization Summary
01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
9
XXM Data Utilization Summary (up to S79)
01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
10
UVIS TEAM MEETING OPERATIONS UPDATE
S80 to S83 Data Utilization Estimated unused allocation (after the fact SP numbers are about 1% higher) S80: 4% S81: 5% S82: 8% S83: 7% Sponge bit in S82: Used to increase the spectral resolution in UVIS_201RI_SP90L70S022_CIRS UVIS_201RI_PROPRETRG001_ISS UVIS_201RI_SHDSCANU001_VIMS 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
11
UVIS TEAM MEETING OPERATIONS UPDATE
OPS Team Status Darren is full time QuikScat, Ops group interface with IT and OpsSw group, MMS and UVIS Crystal is back at 100% since 11/1 UVIS and Kepler Alain is part time (75%) UVIS, QuikScat and OASIS software 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
12
UVIS TEAM MEETING OPERATIONS UPDATE
Notes and Reminders The list of ring occultations that contain an atmospheric occultation is on the team web site at The list of all the tour calibrations is on the team web site at The UVIS PEFs are on the team web site at 01/08/14 UVIS TEAM MEETING OPERATIONS UPDATE
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.