Presentation is loading. Please wait.

Presentation is loading. Please wait.

Upstream Americas - Deepwater Engineering Projects, Construction, & Diving Heliport HSSE Engagement Session February 2012 January 2, 2019 1.

Similar presentations


Presentation on theme: "Upstream Americas - Deepwater Engineering Projects, Construction, & Diving Heliport HSSE Engagement Session February 2012 January 2, 2019 1."— Presentation transcript:

1 Upstream Americas - Deepwater Engineering Projects, Construction, & Diving Heliport HSSE Engagement Session February 2012 January 2, 2019 1

2 What are the Hazards? January 2, 2019

3 What are the Hazards? January 2, 2019

4 Recordable Incident: Fractured Wrist
Root Cause / Contributing Factors: Employee failed to utilize a handle while using drill The employee did not anticipate the amount of torque the battery operated drill was capable of generating. The co-worker failed to use Stop Work Authority when the employee began to utilize a drill without a handle. January 2, 2019

5 January 2011 BBSM Data Multiple exposures per BBSM data:
Slips, Trips & Falls: Housekeeping Slips, Trips & Falls: Use of Barricades PPE: Hands & Gloves PPE: Eyes & Safety Glasses January 2, 2019

6 January 2011 SWI’s Stop Work Interventions performed for the following incidents: Employee changing disk in grinder without unplugging grinder Personnel executing hot work with faulty equipment and melted welding leads without being aware Wrong date on barricade tag for overhead work on scaffolding Flammable material in Safe Welding Area January 2, 2019

7


Download ppt "Upstream Americas - Deepwater Engineering Projects, Construction, & Diving Heliport HSSE Engagement Session February 2012 January 2, 2019 1."

Similar presentations


Ads by Google