Presentation is loading. Please wait.

Presentation is loading. Please wait.

SA1: third year overview

Similar presentations


Presentation on theme: "SA1: third year overview"— Presentation transcript:

1 SA1: third year overview
Arpad Szomoru JIVE

2 EXPReS Board Meeting, Msdrid, Spain: SA1
Outline Accomplishments in 2008 Soft- and hardware developments Aims for 2009 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

3 e-VLBI science/test runs
27 (18) e-VLBI science projects accepted since 2006: 2 failed (in early 2006) 15 active binary systems (Algol-type, X-ray or gamma-ray binaries); 10 of these were ToO projects 3 part of multi-wavelength campaign 1 adaptive observation of 16 X-ray binaries (no detections..) 1 triggered observation 10 determination of compactness of calibrator or target 1 spectral line run 1 supernova ToO Rapid access to EVN provides clear benefit to users (important for calibrator/multi-wavelength projects) Follow-up observations of bursting transients more successful in 2008 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

4 EXPReS Board Meeting, Msdrid, Spain: SA1
e-VLBI results 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

5 Operational improvements
Overall improvement in third year: Global connectivity Bandwidth Mark5B-based e-VLBI Interoperability with K5 system Inclusion of multiple Merlin stations (via “Merlincast”) On-the-fly fringe fitting Increase of production data rate from 256 Mbps to 512 Mbps for all regular EVN stations Full 1024 Mbps operational data transfer from subset (more to come..) Inclusion of Shanghai, Urumqi, Kashima, Westford, Hobart telescopes 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

6 Operational improvements
Focus during third year: Reaching higher data rates Expanding global network Operational efficiency Operational flexibility (streaming vs recording) Adaptive scheduling Multi-continent global e-VLBI demonstrations (Asia, Australia, South Africa, North and South America) 3-station 1024 Mbps fringes Adaptive scheduling demo 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

7 EXPReS Board Meeting, Msdrid, Spain: SA1
Higher data rates, new tools 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

8 The addition of the big dish, finally
2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

9 EXPReS Board Meeting, Msdrid, Spain: SA1
... And the resulting improvement 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

10 General data rate improvement
2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

11 Passing the 1 Gbps speed bump:
2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

12 Onsala to Manchester, JIVE
FUNET Metsähovi SUNET Onsala NORDUnet routed IP (simplified view) GÉANT2 JANET NetNorthWest Jodrell Bank Rest of NORDUnet TSS Opto ?? TSS L2 Cloud STO NL CSC CPH VLBI, LOFAR SurfNET SUNET project router VLANs 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

13 And this year, more demos
First e-light Hartebeesthoek: Visit of group of high-ranking EC-officials to telescope site Demo within three days of setting up connection 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

14 EXPReS Board Meeting, Msdrid, Spain: SA1
And even more demos TERENA 2008: 4-continent e-VLBI 4-continent fringes! Mixed-configuration observation 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

15 EXPReS Board Meeting, Msdrid, Spain: SA1
Mark5 upgrade: e-VLBI capability in Mark5B (was nonexistent) Dimino: modification of jivemark5a Has been used extensively (Wb, Ef, Yb) Mark5B playback at EVN correlator No problem with recorded data e-VLBI: painfully slow development Works in principle, some problems remain 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

16 Ongoing/upcoming developments
Real-time download and extraction of station information On-the-fly pypeline (created for IYA demo) Automated correlator diagnostics (semi) automatic optimization of bandwidth use Adaptive observing Expansion of 1024 Mbps network Expansion of Merlincast First tests with eMERLIN? Upgrades at stations are needed (adequate mobos in Mk5s, new kernels, new ethernet interfaces) 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

17 EXPReS Board Meeting, Msdrid, Spain: SA1
More telescopes (?) Urumqi: temporary connection 2 more Chinese telescopes Yebes Ventspils Sardinia? Hartebeesthoek...... 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1

18 EXPReS Board Meeting, Msdrid, Spain: SA1
End of 2009: operational e-VLBI 2009 January 21 EXPReS Board Meeting, Msdrid, Spain: SA1


Download ppt "SA1: third year overview"

Similar presentations


Ads by Google