Download presentation
Presentation is loading. Please wait.
Published byJoanna Hamilton Modified over 6 years ago
1
Harry Nelson, UCSB Collaboration Meeting July 1, 2002
DAQ Harry Nelson, UCSB Collaboration Meeting July 1, 2002
2
Collaboration Meeting
The real workers Rupak - in India - most appropriate to give this talk UCSB Crew Joel Sander Ron Ferril Chris Savage Don Holmgren Long Duong Dan Bauer I’m a spokesmodel today….. 07/01/02 Collaboration Meeting
3
Collaboration Meeting
CDMS-II System Substantial Progess on Software Production versions of (nearly) all boards Systems Test at UCSB - success! … ship to FNAL Systems Test at FNAL working! 07/01/02 Collaboration Meeting
4
Collaboration Meeting
ZIP (FE) Board at UCSB Pulser ZIP Board 07/01/02 Collaboration Meeting
5
RTF, Trigger Conditioner, Trigger Logic
Trig. Cond RTF Board Trig. Logic 07/01/02 Collaboration Meeting
6
Collaboration Meeting
Digitizer, Interface Digitizer Interface 07/01/02 Collaboration Meeting
7
Display of a Digitized Pulse
Ran over the weekend of 6/1-2/02 220,000 events, no failures 07/01/02 Collaboration Meeting
8
The Software - http://cdms.physics.ucsb.edu/daqii/
07/01/02 Collaboration Meeting
9
Configuration Manager
07/01/02 Collaboration Meeting
10
Front End Board Configuration
07/01/02 Collaboration Meeting
11
Collaboration Meeting
RTF Configuration 07/01/02 Collaboration Meeting
12
Collaboration Meeting
CAEN Control 07/01/02 Collaboration Meeting
13
Collaboration Meeting
Listen to Errors 07/01/02 Collaboration Meeting
14
Collaboration Meeting
Monitoring Channel 07/01/02 Collaboration Meeting
15
Collaboration Meeting
Event Builder Developed for CDF (R2DM) Assembles subevents, writes to disk In all tests so far, under run control command, but `hardwired’ 1 Tower (2 Towers in July) 50 Mbyte/s (Gigabit) During July, measure livetime, configure from files, use proper event format 07/01/02 Collaboration Meeting
16
Collaboration Meeting
Immediate Future Up and running at FNAL System is portable! Dry run for Soudan Already Apparent Configuration Code Management Keep battle testing through late July Then: Multi crates, etc. (digitizer: Struck 60 Mb/s) Battle test from August until September ON TO SOUDAN! 07/01/02 Collaboration Meeting
17
Collaboration Meeting
Test Sites Who would like to try stuff out? Berkeley July ? 07/01/02 Collaboration Meeting
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.