The U.S.S.E Status Report #3 February 16th, 2009

Similar presentations


Presentation on theme: "The U.S.S.E Status Report #3 February 16th, 2009"— Presentation transcript:

1 The U.S.S.E Status Report #3 February 16th, 2009
Team #4 Description: A follower robot that will assist humans. Antonio Alvarez Janice Cruz Jose L. Gamboa Miguel Rivera

2 Overall Need & Design Milestones
Why is the design needed? Assistant Groceries, tools, and personal belongings Indoor projects Design Milestones Circuit Construction 1/30/09 Programming Phase 2/28/09 Casing Construction 2/28/09 Motors Implementation 3/15/09 Final Design Stage

3 Recent Completed Tasks
Jan 30 Feb 5 Feb 15 Feb 13 Connect and Test circuits With Micro- controller Final Adjustments on Transmitter and receiver Transmitter Case Completed Begin Casing For overall design

4 Recent Completed Tasks
Casing construction Feb 5 Feb 10

5 Ongoing/Pending Tasks
Time: March 24 Assigned: All Test Time: March 20 Assigned: All Run Code With Circuitry Time: February 24 Assigned : All Program/Casing Time: February 07 Assigned: All Software 5

6 Upcoming Tasks Further Test and evaluate microcontrollers Design of exterior structure Obtain extra parts

7 Functional Block Diagram

8 Project Schedule

9 Questions ?

10 Thank You !


Download ppt "The U.S.S.E Status Report #3 February 16th, 2009"

Similar presentations


Ads by Google