Download presentation
Presentation is loading. Please wait.
1
Rail Data Availability Overview
Tables: Freight, Passenger, Accidents, Undertakings Years: 2007, 2008 2-3 April 2009 Meeting of the Working Group on Rail Transport Statistics Agenda point: 4
2
Data Availability Data availability means imported and available in the RAIL production database Snapshot taken at 10:30 01/04/2009 Data available in the production database at 10:30 01/04/2009 already imported in the dissemination database (NewCronos) 13-Jul-07 Name of the presentation
3
Deadlines for data transmissions
Deadline expressed in months after the end of the reference period Annex A table: 5 months Annex B table: 5 months Annex C table: 8 months for tables C1, C2, C5 14 months for tables C3, C4 Annex D table: 8 months Annex E table: 3 months Annex F table: 12 months Annex G table: 18 months Annex H table: 5 months Annex I table: months 13-Jul-07 Name of the presentation
4
Freight Data Availability
1 April 2009 M MISSING TABLES OPTIONAL NOT APPLICABLE AVAILABLE 13-Jul-07 Name of the presentation
5
Passenger Data Availability
1 April 2009 M MISSING TABLES NOT APPLICABLE AVAILABLE 13-Jul-07 Name of the presentation
6
Accident Data Availability
1 April 2009 AVAILABLE 13-Jul-07 Name of the presentation
7
Undertakings Data Availability
1 April 2009 AVAILABLE 13-Jul-07 Name of the presentation
8
THANK YOU FOR YOUR ATTENTION
13-Jul-07 Name of the presentation
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.