Download presentation
Presentation is loading. Please wait.
Published byVivian Blankenship Modified over 5 years ago
1
Rear wall – 1st Exchange Gauze/Biocide Wipe Board Media
Long Velcro Bar (A1 to E1) 150mm Bungee L2 to L5 Gauze/Biocide Wipe Board 2” Velcro Mounting Pad (behind at B5 ) Waste Bag (AKA the Support kit’s bag) Media O-ring Pair 150 mm Bungee (D2 to D5)
2
Floor – 1st exchange Biocell Waste Syringes Plunger Tool Plunger Tool
D1 to D5 B1 to B5
3
Left Side – 1st Exchange Short Velcro Bar ) (where?)
(added post Heart Cells and 2” pad removed) O-ring (2 tied together). Position 4 and 15?
4
Right Side – 1st Exchange
2” Velcro Pad at Position 2 Utility Kit Bag Contingency Kit O-ring (2 tied together). Position 11 and 24
5
Rear wall – 2nd and 3rd exchanges
Gauze/Biocide Wipe Board Waste Bag (AKA the Support kit’s bag) Media 2” Velcro Mounting Pad (behind at B5 ) 150 mm Bungee
6
Floor – 2nd and 3rd exchanges
Biocells to be exchanged Finished Biocell Stack Biocell being exchanged Velcro Board/ Waste Syringes Plunger Tool Plunger Tool
7
Left Side – 2nd and 3rd exchanges
Short Velcro Bar (where?) O-ring (2 tied together)
8
Right Side – 2nd and 3rd exchanges
2” Velcro Pad behind at Position 2 PHAB Utility Kit Bag Contingency Kit
9
Rear wall layout – Sampling/Processing Day
Short Velcro Bar (where?) Rear wall layout – Sampling/Processing Day Gauze/Biocide Wipe Board Waste Bag (AKA the Sampling Kit’s bag. The Sampling Kit also has an extra bag) 2” Velcro Mounting Pad (behind at B5 ) Saline Board 150 mm Bungee
10
Floor – Sampling/Processing Day
Biocells to be processed Finished Biocell Stack Biocell being processed Waste Syringes & Monovettes Plunger Tool Plunger Tool
11
Left Side – Sampling/Processing Day
O-ring (2 tied together) Osteomics Sampling Preservative Board
12
Right Side – Sampling/Processing Day
2” Velcro Pad behind at Position 2 PHAB Utility Kit Bag Contingency Kit
13
Revisions Revision Notes Initials Date A Initial Release MAL
06/29/2015 B Updated per latest payload baseline 07/01/2015 C Updated to sync with latest kit details 07/13/2015 D Updated PPT format for clarity 07/21/2015 E Updated details for waste bag 07/28/2015 F Major update per MSG fitcheck 08/20/2015 G Updates to fixation day 10/19/2015 H Major update per run through 10/30/2015 I Added utility kit to MSG 12/11/2015 J Updated fixation day layout 03/02/2016 K Swapped left and right sides 05/11/2016 L SMB 07/13/16
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.