1 Integrated Capacity Analysis Working Group
January 20, 2017 In-person meeting drpwg.org

2 Agenda Time Topic 9:00 – 9:10 9: 10 – 11:00 11:00 – 11:30
Review of Schedule 9: 10 – 11:00 Discussion of IOU written responses, recommendations development 11:00 – 11:30 Discussion of costs, modeling software (tentative)

3 ICA and LNBA Working Group Background
ICA and LNBA WG Purpose - Pursuant to the May 2, 2016, Assigned Commissioner’s Ruling (ACR) in DRP proceeding (R ), the Joint Utilities are required to convene the ICA and LNBA WG to: Refine ICA and LNBA Methodologies and Requirements Authorize Demonstration Project A and Project B CPUC Energy Division role Oversight to ensure balance and achievement of State objective (ensure adequate stakeholder representation in consensus statements, keeping WG activities on track with Commission expectations/needs, demonstration project results review, quality control on deliverables) Coordination with both related CPUC activities and activities in other agencies (IDER CSF WG, CEC and CAISO interagency matters, interconnection/Rule 21/SIWG, other proceedings that may impact or be impacted by locational value calculation such as AB 350/IRP and LTPP/TPP/RPS) Steward WG agreements into CPUC decisions when necessary More Than Smart role Engaged by Joint Utilities to facilitate both the ICA & LBNA working groups. This leverages the previous work of MTS facilitating stakeholder discussions on ICA and LBNA topics.

4 Schedule Sunday Monday Tuesday Wednesday Thursday Friday Saturday 13
14 15 16 17 18 LNBA: first draft report ICA: webinar ICA: first draft report LNBA: first round of edits due 19 20 21 22 23 24 25 ICA: first round of edits due LNBA: second draft report ICA: second draft report LNBA: final edits due 26 27 28 1 ICA: final edits due IOUs submit reports

5 Resources: http://drpwg.org
LNBA: First draft report (2/13) – redline edits by 2/17 to Draft consolidated recommendations (2/7) XLS CPUC Memo on LNBA Use Cases  (2/1) First draft outline(1/26) CALSEIA, SEIA, Clean Coalition, Vote Solar (1/18) TURN (1/13) Karey Christ Janer (1/10) ICA: Draft consolidated recommendations (XLS) (2/13) Joint IOU written responses to stakeholder questions (2/10) Joint IOU recommendations – smart inverters (2/10) First draft outline (2/3) TURN (2/1) stakeholder subgroup (2nd version)(1/30) ORA 12 success criteria (first draft)  (1/18) ORA (1/11) Stakeholder subgroup (1/11)

6 2/14 Webinar Goal: Develop as many consensus WG recommendations as possible with the information available. Detail where there is non-consensus in the report. Recommendations contingent upon modeling software/cost information should be identified in the report as pending additional data. Proposed Approach: Begin with recommendations ID’d as “Agree, with Modifications” After webinar if your party’s recommendation has changed, or viewpoint is not reflected/differs from the “IOU written responses to stakeholder subgroup” document, please with language MTS will circulate a draft EOB 2/15 for first round of comments