Presentation is loading. Please wait.

Presentation is loading. Please wait.

Country requirements and relevant CSIS implementation aspects:

Similar presentations


Presentation on theme: "Country requirements and relevant CSIS implementation aspects:"— Presentation transcript:

1 Country requirements and relevant CSIS implementation aspects:
Support needs synthesis International Workshop on CSIS Operations and Coordination 22 March 2017 Maxx Dilley, Director Climate Prediction and Adaptation Branch Climate and Water Department

2 Outputs FLEXIBLY GENERATED AT MULTIPLE levels, E.G.: Global Regional
national Although it should be transparent to the user. The basic system is not all operated at country level. The red line shows a country case in which the historical data, on-going observations and monitoring are done at the country level but the weather and seasonal forecasts are done regionally and the climate change scenarios are done by global centers.

3 Value-added AT COUNTRY LEVEL
Outputs FLEXIBLY GENERATED AT MULTIPLE levels, e.g.: Global Regional national Value-added AT COUNTRY LEVEL This is a case with a weak NMHS and no regional support – everything is coming from global centers. No matter what though, the NMHS should be able to add some value to these data and products from a local perspective and offer interpretation and communication to its users. SERVICE DELIVERY AT COUNTRY LEVEL

4 CAPACITY DEVELOPMENT (SUSTAINED, IN-COUNTRY): PE, PN, do, mo, bf, BH
INTERNET ACCESS: PN, DO, bf National scale Reanalyses: MO, TZ STRENGTHENED, SUSTAINABLE obs. SYSTEM, w/QA: pe, pn, do, BF, tz S2S forecasts AND ACCESS TO DATA/MODEL OUTPUTS: pe, MO, bf, BH BF BH Climate change projections: DO, MO, BF, BH, tz Data INTEGRATION, E.G. METEO & HYDRO: PN, BH, BH, TZ Data RESCUE, QA: PN, bh data management system: PE(?), PN, do(?), MO Severe weather/ Flood forecasts: PE, MO, BF, TZ EXTREME EVENT CLIMATOLOGY: mo, tz DATA ANALYSIS CAPAcITY And tools: Mo, bf, bh, TZ Communication: PE, PN, BH Impacts forecasts: PE, DO, MO, BF, BH, tz (CO-PRODUCED) TAILORED PRODUCTS: PE, PN, DO, MO, BF, BH, TZ PPP: DO, MO, BF

5 Others

6 Common priorities

7 Thank you


Download ppt "Country requirements and relevant CSIS implementation aspects:"

Similar presentations


Ads by Google