Presentation is loading. Please wait.

Presentation is loading. Please wait.

FASIT Technology Working Group

Similar presentations


Presentation on theme: "FASIT Technology Working Group"— Presentation transcript:

1 FASIT Technology Working Group
James Todd Project Lead Target Modernization PM TRADE

2

3 FASIT Low Bandwidth ICD
FASIT RF: Summary What We Learned Challenges Solution Timeline 30 November 2011

4 TRACR IA and Suite TRACR Information Assurance:
Latest TRACR Requirements Processes Accreditation boundary STIG and SCAN TRACR Suite: Implementation Updates 30 November 2011

5 FASIT Performance Specification
FASIT Requirements: What are the issues driving cost and complexity What are the divergent points between ATS and FASIT How can we assist 30 November 2011


Download ppt "FASIT Technology Working Group"

Similar presentations


Ads by Google