Presentation is loading. Please wait.

Presentation is loading. Please wait.

Duct Insulation Attachment Team

Similar presentations


Presentation on theme: "Duct Insulation Attachment Team"— Presentation transcript:

1 Duct Insulation Attachment Team
Portland State University Michael Thilavanh, Osten Palmrose, Chase Doyel, Clint Everett, Haoyuan Xu, Sheng Chen

2 Introduction Sponsored by Streimer Sheet Metal Works Goals:
20% speed improvement 95% success rate Accommodates 1 and 2 inch Gripnails Accommodates various shape, size sheet metal

3 Previously...

4 Revised Design

5 Linear Motion and Hopper
1 stationary head, 3 moveable heads Move along single ACME screw Supported by upper and lower rail Desire is to place a hopper on each actuator Hopper sizing and availability needs further research

6 Frame and Impact Surface
I-beam for the center column Square tubing for frame structure FEA analysis showed extended support had greater strength Raised impact surface

7 Actuators Performed Tensile test and Impact test in ME 411
Used to determine impact required to fasten Gripnail Magnet holds Gripnail Secondary actuator loads Gripnail

8 Control Panel 8 electronic air solenoids 4 for impact actuator
4 for loading actuator PLC unit for machine control Moisture separator

9 Questions?


Download ppt "Duct Insulation Attachment Team"

Similar presentations


Ads by Google