Download presentation
Presentation is loading. Please wait.
Published byAubrey Small Modified over 6 years ago
1
The Convergence of Traffic Management and Electronic Tolling
ITS Virginia The Convergence of Traffic Management and Electronic Tolling The Future of Integrated Transportation Management Systems July 17, 2015
2
Mobility 2000 IVHS ITS / Telematics 28 User Services
History Lesson….. Mobility IVHS ITS / Telematics 28 User Services ETC was an integral part of the ITS Program | The Convergence of ITS and ETC | 2
3
Divergence / Convergence Timeline
ETC ETC/ITS ITS Early 1990s | The Convergence of ITS and ETC | 3
4
Electronic Tolling had…
Why the Divergence??? Electronic Tolling had… Commercialized Products Standardization efforts Strong Return on Investment ITS had…. Emerging Technologies Demonstration Projects Need for funding sources | The Convergence of ITS and ETC | 4
5
Divergence / Convergence Timeline
ETC ITS Early 1990s ~2005 | | The Convergence of ITS and ETC | | 5 5
6
The Convergence has Begun
Electronic Tolling … Was transitioning into 2nd or 3rd generation systems (ETC-ORT-MLFF) Widely accepted and deployed ITS had…. Mature, standards based technology Demonstrated benefits Cost effective applications | The Convergence of ITS and ETC | 6
7
Divergence / Convergence Timeline
ETC ETC/ITS Today ITS Early 1990s ~2005 2010 2015 | | The Convergence of ITS and ETC | | 7 7
8
Today Convergence is Required
Managed Lanes … Toll rates need to be set based on actual traffic conditions ITS …. Is required to properly set toll rates Operations… Traffic and revenue are managed by the same resources | The Convergence of ITS and ETC | 8
9
LBJ / NTE Managed Lanes – Dallas, Texas
| The Convergence of ITS and ETC | 9
10
LBJ / NTE by the Numbers North Tarrant Express.
2 road segments in 13.5 mile corridor 3 General Purpose , 2 Managed Lanes and 2 FRL per direction 11 Toll Zones Service commencement on June 2014 Second Segment went live on October 2014 LBJ Express. 17 miles long corridor in 3 road segments 4 General Purpose , 3 Managed Lanes and 3 FRL per direction 18 Toll Zones First Segment went live on November 2013 Second Segment went live July 2014 Not talking theoretical, talking via a real example The LBJ and NTE Managed Lanes Projects Largest and newest managed lanes implementation in North America | The Convergence of ITS and ETC | 10
11
ITS & ETC Integrated Technologies
TRS & DMS Signs CCTV & MVD | | The Convergence of ITS and ETC | | 11
12
Integrated Traffic Operations
| The Convergence of ITS and ETC | 12
13
Integrated Maintenance
| The Convergence of ITS and ETC | 13
14
Traditional Approach to Design
MOMS Toll Zone & Sensors ITS Sensors & Equip MOMS TCS ATMS Toll Ops TMC BOS 511 & Public | The Convergence of ITS and ETC | 14
15
Integrated Approach to Design
Toll Zone & Sensors MOMS ITS Sensors & Equip TCS Toll Setting Module ATMS BOS Int Ops Ctr 511 & Public | The Convergence of ITS and ETC | 15
16
Convergence of ITS and ETC
Integrated Transportation Management Systems ITS | The Convergence of ITS and ETC | 16
17
Driving Change: Managed Lanes
| The Convergence of ITS and ETC | 17
18
Driving Change: Connected Vehicle
| The Convergence of ITS and ETC | 18
19
Driving Change: Market Demand
LBJ/NTE Express Lanes in Texas I495 & I-95 Express Lanes in Virginia I-95 Express Toll Lanes in Maryland MTC, LADOT, BATA Express Lanes in California I-75 and I-575 Express Lanes in Georgia NC I-77 HOT Lanes in North Carolina Transform I-66 in Virginia | The Convergence of ITS and ETC | 19
20
Kapsch TrafficCom North America
Dan Toohey Kapsch TrafficCom North America We Make Your Traffic Flow Thank You | The Convergence of ITS and ETC | 20
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.