1 Module Production in Brussels
One plate in repair in Aachen (R5S) Frames for R5 are too thick Currently producing R6 modules (alignment modules) Tracker week April 2005 10/01/ | pag. 1

2 R5S plate in repair (Aachen)
We have in total 2 R5S plates hence maximum 6 R5S modules per day One position (1/6) has vaccuum leaks possibility to be repaired in Aachen difficult operation when not succesful, the position is lost proposal by Louvain-la-Neuve (UCL) make new plate as back-up (time-scale: end of May) they are investigating the possibility Titel van de presentatie 10/01/ | pag. 2

3 R5 frames are too thick Only affects R5 frames (made in Aachen)
All other TEC frames made in Brussels Gantry plates have a fixed groove depth they accomodate frames up to 900 microns when thicker the frame exceeds the sensor level extra glue spots in sensor corners added (~) one year ago yesterday: meeting in Brussels with W.Braunschweig proposal to remove them for R5, R6 and R7 frames Titel van de presentatie 10/01/ | pag. 3

4 R5 frames are too thick Frame too thick only on specific places
These glue points will be removed (proposal) Silicon glue put when assembling module (Gantry) frame sensor kapton frame sensor Araldite glue put when assembling frame (manual) In the corner of the sensor to make the bonding between PA and sensor easier is this area. Titel van de presentatie 10/01/ | pag. 4

5 Alignment sensors production
Urgent need for 6 R6 alignment modules we use a new sensor pick-up tool (UCSB) precision of modules is fine (dry assemblies) we glue them with ‘old’ (but good) hybrids They are glued today... over the last days glued normal R6 modules all grade A hence expect no problem for the alignment sensor modules Titel van de presentatie 10/01/ | pag. 5

6 Conclusion Possibly 1/6 position lost for R5S
due to vaccuum problems R5 frames being repaired in Aachen Production R5 slow : frames issue Production R : no hybrids Production R : only with old hybrids >2 FTE doing nothing most of the time !! Titel van de presentatie 10/01/ | pag. 6