Gaining Trust Through Data-Driven Decisions
Operational Success: Gaining Trust Through Data-Driven Decisions Dawn
3
Speakers Dawn M. Rhodes, chief business & finance officer and vice president for administration and finance, University of Maryland, Baltimore. Nicole Miskimon, associate director, facilities management, University of Maryland, Baltimore. Denise Meyer, facilities management project coordinator, University of Maryland, Baltimore. Dawn
4
Learning Objectives Identify steps in a comprehensive strategic facility assessment program. Recognize the layers of analysis required to inform decision making. Engage stakeholders using data and analytics. Dawn
5
Facts about UMB Founded 1807 – University of Maryland, Baltimore (UMB) is MD’s only public health, law and human services university. Enrolls approximately 6,500 students in six nationally ranked professional schools. Employs approximately 7,200 people. Has an all funds budget of 1.2 billion. FY 2017 – awarded $556.1 million in grants and contracts. 68 buildings totaling approximately 7.9 million GSF. Dawn Schools/disciplines - medicine, law, dentistry, pharmacy, nursing and social work and an interdisciplinary Graduate School
6
Background Information
Enterprise Risk Management process identified: Significant backlog of deferred maintenance projects. Issues of transparency in deferred maintenance projects and how they are prioritized. The need for campus wide building assessments. Denise
7
Assessment Process Process includes quantifying campus renewal and deferred maintenance needs, their values and time of replacement. Steps to the process Collect data Understand data Analyze and prioritize data Utilize and maintain data Denise Collect – assessment process Understand – Use analytics to quantify our data and current situation Prioritize – Collaborative Prioritization Workshop. The criteria selected by the group are utilized to populate a prioritized list of DM projects. Maintain – Reassessment cycle conducted over 5 years started June,2017. Utilize – use data to drive meaningful decision making
8
Assessment Process – Data Collection
Review available documentation and speak with knowledgeable staff. Walk entire campus and every square foot of our buildings to visually inspect all building, infrastructure and site systems. Photo documentation and assessment of condition. Estimate or identify age of each system and its remaining useful life. Identify repairs and code upgrades. Estimate each systems replacement value. Adjustment Factor – Project costs are adjusted by a factor of two to reflect actual costs. Denise 3rd Party Company provided us with assessment services. Assessment team was comprised of structural, electrical and mechanical engineers. THIS CAN BE DONE IN HOUSE IF FUNDS ARE NOT AVAILABLE TO USE A CONSULTANT. UMB Adjustment Factor – Project costs are adjusted by a factor of two to reflect actual costs. Initial estimate has labor and parts. We increase it by a factor of two to arrive at total cost which includes Design costs, project management fees, etc. -Average factor used amongst other universities -Frequently reviewed R.S. Means is America’s leading supplier of construction cost information. The database uses this as an estimator for parts and labor costs of replacements and renewals.
9
How the database helps Captures all of our campus assets.
Including buildings, infrastructure, etc. Centralized location for asset condition data. Keeps this data current Is actively used as a tool for communication and reporting. We hold meetings, provide detailed reports and data analytics for stakeholders Dawn Engaging our campus leadership using the data, where we were and where we are now.
10
Denise VFAFacilityView – dashboard style view of our data
11
Example Reports from Database
Asset Overview and Detail Reports Example Asset Overview Report Project Detail and List Reports Funding and Forecast Scenarios Budget and Ranking Scenarios Executive Reports Denise View Asset Overview Report outside of the PP Presentation. Asset Overview Report available as a session resource.
12
Understanding the Data UMB FCI
The overall deferred maintenance backlog for UMB is $648 million over next 5 years. The current overall FCI is: (32.9%). Dawn Information from 3rd party assessment and VFA.facility database. 492 assets which includes state supported assets, campus infrastructure, auxiliary and parking assets. For the purpose of this presentation we are focusing on data related to: 53 building + site utilities and other Site utilities/Site other are things such as sidewalks, pole lamps, lawns and gardens, underground infrastructure, etc.
13
Understanding the Data UMB FCI Funding Scenarios
Dawn Funding Scenarios are all estimates Current Funding – current funding of 15.7M with an additional 3M added each year until 2028; 42.7M is used from for this report. 2% CRV (Current Replacement Value) – 38,917,902 per year for 20 years; CRV is 1,945,895,099. Target FCI – half of current FCI (32.9%) Information from 3rd party assessment and VFA.facility database.
14
Prioritizing the Data Using the database and its analytic tools, our working group: Created an agreed-upon prioritization criteria Defined and weighed the overall criteria Created and agreed-upon ranking of the decision criteria based on linkage to UMB’s priorities Nicole
15
Prioritizing the Data Risk Evaluation
Nicole To assist with the priority ranking of projects in the database, a risk assessment has been applied to every system. As part of the risk assessment, a value has been determined in these four categories – Impact of Failure, Condition, Probability of Failure and Frequency of Failure. There is a PDF version of this table available as a session resource.
16
Risk Evaluation A spreadsheet was used to capture rankings for each category and determine the calculated risk for each system. Calculated Risk = High Calculated Risk = Medium Calculated Risk = Low Nicole
17
Risk Evaluation Risk value is assigned within database to system.
Risk associated with a system is carried over onto each project the database generates for that system. Nicole
18
Strategy Buckets Hold for Major Renovation/Capital Improvement Plan These projects are being held for renovation or capital improvement initiatives. Maintenance These projects are smaller in scope, size and cost. Maintenance staff will be used to satisfy these. Must Do Projects in this category are immediate needs. Run to Fail These projects will be monitored and systems will be used or operated until failure. A decision will be made to repair or replace the impacted system(s) at the time of failure. Nicole After the risk evaluation and overall prioritization is complete, we will begin to assign projects to Strategy Buckets. This next layer of evaluation will help us to further prioritize the work to be done while considering some of the circumstances beyond the physical inspection of systems and risk of failure while taking operating needs and planning initiatives into consideration.
19
Financial Plan Dawn
20
Reserve Funding Categories
Failure Reserve Campus Safety and Security Campus Beautification Unscheduled Deferred Maintenance Dawn
21
Next Steps Continue to drive our annual deferred maintenance decisions. Implement on-going database enhancements and improvements. Reassess and update the assets in the database. Discuss information with individual schools and deans. Share information with key stakeholder groups. Staff & Faculty Senate, State and local government, etc. Dawn
22
Please take a moment to evaluate this session There are two ways to access the session and presenter evaluations: 1 2 In the online agenda, click on the “Evaluate Session” link From the mobile app, click on the session you want from the schedule > then click the associated resources > and the evaluation will pop up in the list