Group Members: Muhammad Hadir Noman Mansoor Chandna Muhmmad Aamir
Energy Consumption Monitoring and Controlling System Using Wireless Sensor Networks Supervisors: Dr Sayeed Ghani Sir Farhan Ahmad Siddiqui Group Members: Muhammad Hadir Noman Mansoor Chandna Muhmmad Aamir 1st March,2014
2
Motivation To move our society towards betterment.
Immense Amount of Electricity Bills at IBA. In last 5 years bills have gone from 7-8 million to million rupees per year. Practical Project. Can be Applied Commercially. Interest in the field of Networking. 1st March,2014
3
Background AlertMe Nest Belkin - WeMo
Intelligent Lighting System Using Wireless Sensor Networks. A.A.Nippun Kumaar, Kiran.G2, Sudarshan Real-time Energy Monitoring and Controlling System based on ZigBee Sensor Networks Woong Hee Kim, Sunyoung Lee, Jongwoon Hwang 1st March,2014
4
Project Objectives To reduce the amount of energy consumption at IBA.
To design a network of sensors for collecting data. To utilize the data gathered from sensors in decision making. To develop an online portal for monitoring the status of useless energy consumption. 1st March,2014
5
Wireless Sensor Network(WSN)
Definition: A network of spatially distributed autonomous sensors to monitor physical or environmental conditions e.g. Temperature, Light, Pressure etc. (Wikipedia) -Typical multi-hop wireless sensor network architecture Applications: Area Monitoring, Air Pollution Monitoring, Traffic Congestion etc. 1st March,2014
6
System Design MIB520 Gateway IRIS XM2110 Central Server
Mesh Network Of Sensor Nodes 1st March,2014
7
System Design (Cont.) 1st March,2014
8
Hardware Specifications
Mote Module: Crossbow IRIS – XM2110 2.4GHz, IEEE Compliant 250 Kbps Data Rate Each Node has Routing Capability 75 to 100 m Range (Outdoor) 20 to 30 m Range (Indoor) ZigBee Standard. 1st March,2014
9
Hardware Specifications (Cont.)
Sensor/ Data Acquisition Board: MDA100 Thermistor Sensor Light Sensor 1st March,2014
10
Hardware Specifications (Cont.)
Gateway: Base Station for Wireless Sensor Networks. USB Port for Programming IRIS/ MICAz motes. 1st March,2014
11
Software Specifications
MoteWorks: End-to-End Enabling Platform for Creation of WSN Software Tiers: Mote Tier: Xmesh: Software for networking algorithms that form a reliable communication to connect all nodes . Server Tier: Facility that handles translation and buffering of data. Client Tier: Graphical Interface to manage the WSN i.e. (MoteView 2.0) 1st March,2014
12
Software Specifications (Cont.)
Web Panel Technology: MVC Based Java Web Application Struts2 Framework MySQL Database JSP/JSF JavaScript HTML + CSS Backend Frontend 1st March,2014
13
Methodology Defined Thresholds In Database of Temperature and Light for Each Room. 1st March,2014
14
Methodology (Cont.) Made a Time Table of classes In accordance to ERP structure 11 January 2019
15
Methodology (Cont.) Made a Statistics Table to Record Decisions
11 January 2019
16
Room’s Threshold Values
Methodology (Cont.) Records of Last Fifteen Minutes from Current Time Class Schedule of Room Room’s Threshold Values IF CLASS (YES) { normal } IF CLASS (NO) { Actual Average Temp. IS LESS THAN Threshold Temp { AC PROBLEM } Actual Average Light IS GREATER THAN Light Threshold { LIGHT PROBLEM } } Into Database 1st March,2014
17
Data From Sensors 1st March,2014
18
Data Charts 1st March,2014
19
FCS Building Network Topology
Third Floor Second Floor First Floor Ground Floor 1st March,2014
20
ROOM NO DESCRIPTION MOTE SENSOR
CC1 First Floor Class Room CC5 Second Floor Class Room SIR SAYEED GHANI Faculty Office SIR FAISAL IRADAT SIR WASEEM WSL Web Sciences Lab AI Lab Artificial Intelligence Research Lab Board Meeting Room Meeting Room Student Centre 11 January 2019
21
Test Run Results 1st March,2014
22
Sensor Nodes Installed in FYP Building
11 January 2019
23
Sensor Nodes Installed in FYP Building
11 January 2019
24
Energy Consumption Monitoring and Controlling System
Project Timeline Project Name: Energy Consumption Monitoring and Controlling System DATE DESCRIPTION 02 – Understanding the working of sensors. 15 – Acquisition of data from the sensors. 22 – 1st Progress Report 05 – Manual Analysis of Data. 20 – Database Design for the web panel. 23 – Started work on decision making algorithm. 07 – 2nd Progress report 25 – Started working on Web Panel 26 – Installation of Sensor Nodes Throughout FCS Building. 01 – Presentations of FYP-1. 1st March,2014
25
Milestones Gained understanding of the equipment.
Established a small network of sensors. Gathered light and temperature data of two rooms. Manual Analysis of Data. Design of Business Logic. Development of Web Panel. Installation of Sensor throughout FCS building for live data. 1st March,2014
26
Milestones (To Be Achieved)
To fetch time table data directly from the ERP. To improve on our existing web monitoring panel and to add more functionality to it. To improve our business logic to take more accurate decisions. 1st March,2014
27
Technical Limitations
Range of the motes. Battery Life of motes. Extra Classes Issue. Available data is of light and temperature. 11 January 2019
28
Thank You! 1st March,2014
29
QUESTIONS 1st March,2014