Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)

Similar presentations


Presentation on theme: "Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)"— Presentation transcript:

1 Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)
Timing Issue for Mercury Target Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN) Adrian Fabich (CERN)

2 • • • ••• • • ••• ••• • • Super Cycle Structure Super Cycle User MERIT
SC 1 SC N SC 2 MERIT MERIT MERIT ••• ~20 s ~20 s ~20 s Super Cycle User MERIT MERIT ••• ••• User Cycle1 User Cycle n User Cycle2 User Cycle15 Δt= n (# of slot)×1.2s Super Cycle Length (Currently foreseen for 2007) 16.8s (FT) 18s (FT+CNGS commissioning) 22.8s (FT+CNGS LI) 34.8s (FT+CNGS HI) 43.2s (LHC filling) Run for days, 2006 Run for 30 min or test period

3 • • • • • ••• • PS User Cycle Beam Shape & Structure 800 ms 1.2 s time
warning xx (time delay to beam ms) : 2ms B(t) Triggering Signal : TTL standard logic 800 ms Finalized with hardware 1.2 s time t=0 for MERIT Jitter : 250 ns Extraction time Beam Shape & Structure 50 ns Bunch length : 50 ns ••• ~800ms ns

4 ••• • • • ••• Time Delay 20 s 20 s Super Cycle : 20 s – Time Delay
Camera Trigger : n×1.2 s ms Magnet Trigger Delay Unit Hg Trigger Proton Synchrotron MERIT ••• Distance ≈ 400 m Cable Delay = 5 ns/m = 2 μs/400m Beam Travel Delay = 3.3 ns/m = 1.32 µs/400m Signal to Beam Delay ≈ 1.32 – 2 = µs/400m SC for MERIT SC for MERIT ••• 20 s 20 s Signal to MERIT Adjust at Next Beam Shot Beam

5 • • • • • Operation Flat Top Region of Magnetic Field
: 8.5 s ~ 9.5 s (1 sec) ? What precision is required ? Tolerance ? Beam shot ? Mercury Jet Velocity Profile at Target Velocity V=20m/s 8.5 s Precision ? Tolerance ? Beam shot ? Flat Top Region of Steady Jet flow : 8.5 s ~ 9.5 s (1 sec) ? 9.5 s Time 10 s

6 • • • Signal Sequence for Mercury Target SC Δt 20 s
Low Intensity Regular Intensity Beam Δt 20 s Trigger Camera Delay : 20s - n×1.2 s ms – Jitter -1μs ± 300 ns Trigger Hg Loop Delay : Ex. 20 s – 9.0 s ± 1ms Trigger Magnet Delay : Ex. 20 s – 9.0 s ± 1ms Trigger Detector 20 s Delay : 20s - n×1.2 s ms – Jitter -1μs ± 300 ns variable Beam Inhibit (On/Off) Δt≤3.6 Δt_start ≥ 3.6s Δt_stop No Beam to MERIT MERIT Beam


Download ppt "Hee Jin Park (SUNY Stonybrook, BNL) Ilias Efthymiopoulos (CERN)"

Similar presentations


Ads by Google