1 PaP Publication strategy TT2019 – Combined PaP
RU AG, PCS CCB

2 Current situation & possible solution

3 Problems PaP calendars are not stable during the Harmonization and Path Elaboration phase Publication of calendar is often useless and a week later presents wrong information to the customer Calendar is changed in the national system Calendar is blocked in PCS Combined PaP/Tailor-made solution Aim: cover the not available days with automatically created subsidiary timetables (managed by PCS) Problems of the feature: Due to first point above the originally available days are not available anymore RU cannot edit the managed by PCS timetables Hard to understand the logic and quite difficult to manage them as a user IM cannot delete the managed by PCS timetables IM doesn’t edit the managed by PCS timetables, even if they could do that. They rather create their own national subsidiaries Unreadable offers: main timetable, managed by PCS subs, IM created national subs, comments, contradictions, overlapping 11 January 2019

4 Solution Empty Envelope Concept would solve the problem
Multiple PaPs per section is supported RFC could make pre-allocation or request tailor-made subsidiary per PaPs in each subsidiary Calendar handling (split & join days) is much easier among subsidiary timetables Target release date November 2018 → TTP 2020 Temporary solution is necessary Without development it cannot be solved, however RNE would like to solve it as optimal as possible Trying use elements that might be useful long-term too 11 January 2019

5 Solution Solution that would be ready for TT2019 publication and usage: RFCs publish all running days in the PaP and mark those that will be likely solved as tailor- made* No need for combined PaP/Tailor-made solution as all day marked in the PaP calendar. *RFC 7 doesn’t support the idea of the whole calendar publication, but support the second point in order not to block other RFCs Result RUs can place request on any of the days No managed by PCS subsidiary will be created In case RUs need re-routing, they can make subsidiary timetable same as they do it today RFCs can pre-allocate or request tailor-made PaP by PaP IMs can create national subsidiaries for deviations same as they to it today Please find the an example for better explanation on the following slides 11 January 2019

6 Demonstration of the solution

7 Publication Publication Request Pre-Booking Path Elab. Draft Offer 1 2
3 4 5 6 7 X RFC marks all days in Excel template → Import Import result in PCS → X Flagging RFC flag the TM days in PCS → PaP TM Technically all days are PaPs for PCS. Development is necessary for flagging and visualization. 11 January 2019

8 Request Publication Request Pre-Booking Path Elab. Draft Offer
RU selects PaPs: PaP 1 PaP 2 PaP 3 PaP 4 PaP 5 Result in PCS: Subsidiaries (optionally) TM PaP Main TT (1-3) PaP TM Feeder PaP PaP TM PaPs PaP TM RU selects running days (1 – 3) Outflow 11 January 2019

9 Pre-Booking Publication Request Pre-Booking Path Elab. Draft Offer
Dossier content for RFC: Feeder PaP 1 PaP 2 PaP 3 PaP 4 PaP 5 Outflow Pre-allocation decision by RFC TM PaP Pre-booked PaP Pre-booked Development is needed that K value calculation is based on only PaP days. TM days should be ignored. PAMT report is also affected. PaP Pre-booked PaP TM Request tailor-made PaP Request tailor-made Even though PaP days are presented here, we could see in practice that tailor-made request was/could have been issued in some cases 11 January 2019

10 Path Elaboration Publication Request Pre-Booking Path Elab.
Draft Offer Dossier content for RFC: Feeder PaP 1 PaP 2 PaP 3 PaP 4 PaP 5 Outflow Tasks/possibilities for IMs Edit feeder in main TT, option to create sub at anytime Edit main TT according to PaP rules, option to create sub for day 1 Edit main TT according to PaP rules Edit main TT, option to create sub at anytime Edit outflow in main TT, option to create to sub at anytime TM PaP PaP PaP TM TM 11 January 2019

11 Draft Offer Publication Request Pre-Booking Path Elab. Draft Offer
What will likely happen with the clean PaPs (PaP 2 and PaP 3)? IM might publish subsidiary also for the clean PaP days Still better option than uploading PDFs Still easier to compare the request to the offer as there won’t be any managed by PCS subsidiary timetable Offer: Days that are covered by subsidiaries: offer in the subsidiary Days that are not covered by subsidiaries: offer in the main timetable (main route), everything else should be only deviation. Technically PaPs are only in the main timetable. Request for the IMs: For better understanding, if subsidiary is really necessary, then please prepare that for your whole network: Origin – Handover Handover – Handover Handover – Destination As you do it already today. 11 January 2019