December 7, 2018 Design Charrette Outcomes

Similar presentations


Presentation on theme: "December 7, 2018 Design Charrette Outcomes"— Presentation transcript:

1 December 7, 2018 Design Charrette Outcomes
MAINTENANCE & OPERATIONS BASE INFRASTRUCTURE AND FACILITIES IMPROVEMENT PROJECT December 7, 2018 Design Charrette Outcomes

2 After week long design charrettes, held on December 3-7, we came up with a revised plan for base improvements.

3 Current Building Locations
Design Charrettes Outcome Sketch - December 7, 2018 Current Building Locations 2 3 1 8 7 4 5 6

4 West Base Main Base 2 3 1 8 7 4 5 6

5 West Base Main Base 2 3 1 8 7 4 5 6 So what are we planning to do?

6 West Base Main Base 2 3 1 8 7 4 5 6 Expand parking lot south of Building 5

7

8

9 West Base Main Base Expand Bus Lot Eastward, add new Fuel, Wash and Fare Collection Facilities Remove Buildings 2 and 3 to expand bus parking Shuttle and Relief Vehicle parking 2 3 1 Building 1 Addition for body and paint 8 - Restripe Bus Lot - Building 1 addition 7 4 Remodel for Articulated Buses and new Tire Shop Reconfigure entrances Expand Parking lot to accommodate ADA parking 5 6 Expand parking lot south of Building 5

10 West Base Main Base Expand Bus Lot Eastward, add new Fuel, Wash and Fare Collection Facilities Shuttle and Relief Vehicle parking Remove Buildings 7 and 8 1 Building 1 Addition for body and paint 8 - Restripe Bus Lot - Building 1 addition 7 4 Remodel for Articulated Buses and new Tire Shop Reconfigured entrances Expand Parking lot to accommodate ADA parking 5 6 Expand parking lot south of Building 5

11 West Base Main Base Expand Bus Lot Eastward, add new Fuel, Wash and Fare Collection Facilities Construct new West Base Building. The New Building 7 Shuttle and Relief Vehicle parking 1 Building 1 Addition for body and paint Add new repair bays - Restripe Bus Lot - Building 1 addition Building addition for new Break rm. 4 Remodel for Articulated Buses and new Tire Shop Remodel interior spaces throughout building Construct new ramp entrance to bus lot Reconfigure entrances Expanded Parking lot to accommodate ADA parking 5 6 Construct new staff and Service Supervisors parking lots Raise employee parking lot and convert to electric bus lot

12 Building 1 Additions and Revised Program Layout
New Repair Bays Building 1 Additions Relocated Tire Shop

13 Moving Forward MAINTENANCE & OPERATIONS BASE
INFRASTRUCTURE AND FACILITIES IMPROVEMENT PROJECT Moving Forward Power Point by Clint Steele