Presentation is loading. Please wait.

Presentation is loading. Please wait.

Training for the 2013 Construction and Material Specifications

Similar presentations


Presentation on theme: "Training for the 2013 Construction and Material Specifications"— Presentation transcript:

1 Training for the 2013 Construction and Material Specifications
Office of Construction Administration Gary Angles, Administrator

2 Introduction, Overview and Implementation Schedule
Focus of this training will be to: Introduce the 2013 C&MS Describe the significant changes with a focus on the changes that may require design consideration

3 Introduction, Overview and Implementation Schedule
The 2013 C&MS was published 12/31/2012 Associated documents published 12/31/2012: Proposal Notes Supplemental Specifications Supplements Associated documents published 1/18/2013: Standard Construction Drawings L&D Manual updates

4 Introduction, Overview and Implementation Schedule
The most significant changes were made in: Items 603, 604 were replaced by Item 611 (To be covered by Becky, and Gary) For all Concrete items, replace Class C, S, F with QC-1, QC-2, QC-Misc (To be covered by Craig, and Jim)

5 Introduction, Overview and Implementation Schedule
Currently all documents, including the Item Master are available on the internet Conversion guidelines: Item Master: C&MS, PN, SS, S: Please note that all projects with an award date of 12/23/2013 (sale date of 12/12/2013) or after must be converted to the 2013 C&MS with no exceptions.  The first SS800 for the 2013 C&MS will be dated 4/19/2013 The last SS800 for the 2010 C&MS will be dated 7/19/2013

6 Introduction, Overview and Implementation Schedule
Todays Agenda: 9:00 am 0.25 hr 2013 C&MS Introduction, Overview, and Implementation Gary Angles, P.E. 9:15 am 0.75 hr Administration Issues, CPM Schedules, and Partnering Clint Bishop, P.E. 10:00 am 0.5 hr Earthwork and MSE changes Stephen Slomski, P.E. 10:30 am Break 10:45 am Pavements and QC/QA Concrete changes Craig Landefeld, P.E. 11:30 am Lunch on your own 12:30 pm Structures changes Jim Welter, P.E. 1:00 pm Environmental changes 1:15 am Hydraulics and the New Item 611 Becky Humphreys, P.E. 1:45 pm 2:00 pm 0.50 hr Traffic, Signing, and Pavement Marking changes Dan Groh, P.E. 2:30pm Review, Summary and Questions 3:00 pm 4.5 hr total End of Training

7 Questions Gary Angles, Administrator
Office of Construction Administration


Download ppt "Training for the 2013 Construction and Material Specifications"

Similar presentations


Ads by Google