Download presentation
Presentation is loading. Please wait.
1
LARP Phase II Secondary Collimator RC-1
DRAFT LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised 11/23/09 LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep No 1/17
2
Strategy for Prototype Tests Overview of SLAC design
Outline Strategy for Prototype Tests Overview of SLAC design Fabrication update Outlook LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep No 2/17
3
Current housing concept for BPMs
DN 152 CF flange mounts to Tank BPM target resolution is 25 microns with Jaw to BPM fiducialization on the order of of a few microns DN 100 Chain clamp flange LHC IR7 Button 61mm diameter geometry for saddle-cut 30.5mm diameter BPM buttons LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep No 15/17
4
Outlook Collimator set is planned for preliminary SLAC testing starting January 2010 Shipment to CERN by August 2010 Machining of Brazed Mandrel (completed) Brazing on the Glidcop Jaws (planned for week of Nov 30) Final Facet machining (during December) LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep No 17/17
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.