1 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY DEKRA INDUSTRIAL
2
2 I N D U S T R I A L Our Services EUROPEAN DIRECTIVES THIRD PARTY INSPECTION AND CONTROL SERVICES WELDING AND BRAZING TECHNOLOGY CONSTRUCTION SUPERVISION & INSPECTION MATERIAL TECHNOLOGY TRAINING AND CONSULTANCY CERTIFICATION OF ADEQUACY DEKRA INDUSTRIAL TURKEY
3
3 I N D U S T R I A L European Directives -97/23/ECPressure Equipment Directive -2010/35/EU Transportable Pressure Equipment Directive -2009/105/EC Simple Pressure Vessels Directive -2006/42/EC Machinery Directive -95/16/EC Lifts Directive -94/9/EC Equipment and protective systems for potentially explosive atmospheres DEKRA Turkey gives inspection and certification services with different notifications of DEKRA Group companies for CE and π marking of pressure vessels, steam boilers and other products according to below mentioned European Directives. DEKRA INDUSTRIAL TURKEY
4
4 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 31 Bar 7200 kg/h
5
5 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 97/23/EC Pressure Equipment Directive for a Steam Boiler 40 Bar 100 Ton/h
6
6 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 99/36/EC Transportable Pressure Equipment Directive for LPG Cylinders
7
7 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 2010/35/EU and ADR for Tankers
8
8 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY Marking According to 2010/35/EU and ADR for Cylinder Valves
9
9 I N D U S T R I A L European Directives DEKRA INDUSTRIAL TURKEY CE Marking According to 87/404/EEC Simple Pressure Equipment Directive for Truck Air Tanks
10
10 I N D U S T R I A L Third Party Inspection and Control Services DEKRA gives project approval, hazard analyze, production control, assembly control and certification services independently on below mentioned facilities and equipments on the base of national & international regulations, norms and technical specifications - Power Plants -Petro - Chemical Facilities -Refineries -Pipe Production and Pipelines -Construction Sites -Steel Construction -Boilers -Pressure Vessels and Equipments -Pre-shipment -Material -Destructive and non-destructive tests -Casting and Forging -Mechanical and electrical installations -Occupational health and safety -Cranes and conveyors DEKRA INDUSTRIAL TURKEY
11
11 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 135 t/h, 427 0C, 62 bar Natural Gas Firing Steam Boiler and equipments
12
12 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 160 MW Thermal Power Plant With Circulating Fluidized Bed Boiler Manufacturing and Erection Control
13
13 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 2X600 MW Thermal Power Plant with Once-Through Π-type with Supercritical Boiler Manufacturing and Erection Control
14
14 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 919 MW Gaz Burned Combined Cycling Power Plant
15
15 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services 220 MW Gaz Burned Combined Cycling Power Plant
16
16 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Third Party Inspection and Control Services Control of Renovation Works for the Biggest Refinery In Turkey (Tupras)
17
17 I N D U S T R I A L Project Follow-Up (Bank Engineering) DEKRA gives investment follow-up (abk engineering) control and certification services independently on below mentioned facilities and equipments on the base of credit agreement and investment plan. - Power Plants -Petro - Chemical Facilities -Refineries -Constructions -Industrial Facilities -Control of Feasibility Report -Monthly/Quarterly Project Progress Control -Cost Control of Project -Control of Project Permission Progress (exproportion, governmental license..etc) -Control of the Financial Inquiry of Investor DEKRA INDUSTRIAL TURKEY
18
18 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Bank Engineering for the 2X600+165 MW Thermal Power Plant in Zonguldak Project Follow-Up (Bank Engineering)
19
19 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 2X600 MW Thermal Power Plant in Iskenderun
20
20 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 50 MW Thermal Power Plant in Kutahya
21
21 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 60 MW Hydro Power Plant in Mugla
22
22 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 13 MW Hydro Power Plant in Katamonu
23
23 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the Biggest Wind Energy Power Plant 150 MW
24
24 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for the 140 MW Wind Energy Power Plant
25
25 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 54,9 MW Poyraz Wind Energy Power Plant
26
26 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Seyitali Wind Energy Power Plant
27
27 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Kozbeyli Wind Energy Power Plant
28
28 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 30 MW Samurlu Wind Energy Power Plant
29
29 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for 20 MW Sayalar Wind Energy Power Plant
30
30 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Electricity Distribution Investment for 5 cities
31
31 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Capacity Extantion project of Biggest Woden Product Manufacturer
32
32 I N D U S T R I A L DEKRA INDUSTRIAL TURKEY Project Follow-Up (Bank Engineering) Bank Engineering for Steel Manufacturer Investment
33
33 I N D U S T R I A L Welding and Brazing Technology -Checking of welding and/or brazing procedure specifications (WPS, BPS) -Testing and certification of welding and/or brazing procedures (WPQR, BPQR) -Testing and certification of welding and/or brazing personnel (WPQ, BPQ) -Inspection and certification of manufacturers on the base of welding and/or brazing adequacy (EN 729-ISO 3834) -Training and certification of welding coordination personnel (EN 719-ISO 14731) -Welding Supervision DEKRA gives training, consultancy, inspection and certification services according to relevant national & international norms (EN, ISO, ASME) for welding processes and personnel DEKRA INDUSTRIAL TURKEY
34
34 I N D U S T R I A L Welding and Brazing Technology DEKRA INDUSTRIAL TURKEY Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 160 MW Power Plant Erection
35
35 I N D U S T R I A L Welding and Brazing Technology DEKRA INDUSTRIAL TURKEY Welder and Welding Procedure Qualification Tests and Sertification acc. 97/23/EC Pressure Equipment Directive for 20 MW Power Plant Erection
36
36 I N D U S T R I A L DEKRA gives inspection, project management, controlling and certification services for each stage of construction projects according to customer specifications and related standards -Project control and approval -Auditing of the construction companies and certification of the adequacy -Construction site control -Hazard Analyze -Mechanical installation (Heating, cooling, air conditioning and plumbing) control -Fire safety system control -Electrical installation control -Control of automation and communication systems -Occupational safety audits Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY
37
37 I N D U S T R I A L ECE Turkey 200.000 m 2 Marmarapark Shopping Center Firefighting, Mechanical Electrical Systems Acceptance Control Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY
38
38 I N D U S T R I A L ECE Turkey 120.000 m 2 Espark Shopping Center Electrical and Mechanical Systems Acceptance Tests Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY
39
39 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY METRO Cash and Carry Antalya Hipermarket Steel Structure Alteration Works
40
40 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY METRO Cash and Carry Karagandy-Kazakhstan Hipermarket Steel Structure Alteration Works
41
41 I N D U S T R I A L Construction Supervision & Inspection DEKRA INDUSTRIAL TURKEY Static Examinations and Soil Investigation for Carrefour Turkey
42
42 I N D U S T R I A L -EN 10204 3.2 Certificate -Batch acceptance tests and certification -Casting / Forging controlling -Optimization and inspection of forming processes -Preparation and inspection of heat treatment processes -Analysis and evaluation of macro and micro structures -Witnessing the mechanical and technological tests and reporting -Determination of remaining life of equipments and materials Certification of conformity of materials, which will be used for production of equipments according to European Directives and/or ASME, Material Technology DEKRA INDUSTRIAL TURKEY
43
43 I N D U S T R I A L Training and Consultancy -European Directives -Harmonize Standards -Pressure equipment regulations (AD 2000, CODAP 2000,…) -ADR -Welding and brazing technology -Welding coordination personnel -Material technology -DT and NDT tests -Occupational health and safety -Fire protection and safety DEKRA gives training and consultancy services with highly experienced experts to provide qualified personnel, which are in need by the industrial fields, about; DEKRA INDUSTRIAL TURKEY
44
44 I N D U S T R I A L Certification of Adequacy Our experts perform audits of production process and quality systems of pressure equipment manufacturers and their material manufacturers within taking into consideration the capability of them. If the results of audits are in conform with the related regulation and standard, certificates will be issued according to; -AD2000 HP0 -EN729 -AD2000 W0 DEKRA INDUSTRIAL TURKEY
45
45 I N D U S T R I A L YOUR RELIABLE PARTNER for QUALITY and SAFETY