Presentation is loading. Please wait.

Presentation is loading. Please wait.

11th Feb 2011, 07:30 pm Lombards, Corscombe

Similar presentations


Presentation on theme: "11th Feb 2011, 07:30 pm Lombards, Corscombe"— Presentation transcript:

1 11th Feb 2011, 07:30 pm Lombards, Corscombe
Common Lane Meeting 11th Feb 2011, 07:30 pm Lombards, Corscombe 12/01/2019

2 Agenda 1. Apologies 2. Grants and Sponsorship Strategy
3. Grants and Sponsorship Plan 4. Restoration Cost Estimates Lane Surface Restoration Lane Drainage Restoration Information Boards Picnic site? 5. Candidate Grant Agencies and Sponsors Key Features for Candidates Price to Win Making the Business case 6. Action Plan 12/01/2019

3 Notice Boards Hardwood £1500 (life 5-7 Years) Aluminium £2000
includes Graphic Design Bespoke Plastic £2500 (Life Years) 12/01/2019

4 Resurfacing Estimates
Planings From Council delivered to lane Substrate (track chippings) £30 per tonne = 5m x 5m x 150cm (£600 per 100m) Base (hardcore) Donated for bad areas only Contractors costs at £3000 per 100m of bad section includes equipment Contractors at £1000 per 100m of average section 12/01/2019

5 Letters refer to map and video references
Common Lane Survey – 1 of 2 Surface Ditch/ Pipes Grips Hedges/ Trees Other Notes Priority A V Good Good None B C Average Low D F G H Culvert Bridge Medium I Poor J K V Poor Soft Surface Advice L Ruts High M N Letters refer to map and video references A B C D F G H I J K L M N Common Lane Survey V4 – 30 Sep 2010 Simon Dalton

6 Letters refer to map and video references
Common Lane Survey – 2 of 2 O R Q P S T Surface Ditch/ Pipes Grips Hedges/ Trees Other Notes Priority O V Poor Poor Good Drainage Advice High P Average V Good Low Q R S Medium T U V Hedges W Party W Badger Spoil X Y Z U V X W Y Z Letters refer to map and video references W Party = Working Party Common Lane Survey V4 – 30 Sep 2010 Simon Dalton


Download ppt "11th Feb 2011, 07:30 pm Lombards, Corscombe"

Similar presentations


Ads by Google