FNAL ARCS Testing Status
Weekly Cumulative A B F % A or B L12pu 12 0.00% L12pd L12su L12sd L34p 217 2 99.1% L56p 45 566 1 3 99.47% R5N R5S R6 R7 Total 795 5 99.38%
3
FNAL ARCS Testing Failures
This Week ( ) 16 PHL+ (!!!) - module , module and module 8502 – 3 pinholes – bonding faults? 7 SHT Cumulative ( ) 3 grade “B” (mishandling; missing bonds on p/a and 6 phls and shorts on mod 8417)) 2 grade “F” mishandling 1 grade “F” (7970) - breakdown current New grade F – (8284) problem with chip #2 (every 8th channel is identified as PHL-) High current 8289
4
FNAL ARCS Testing Results
803 Total Tested 795 Grade A 3 Grade B 5 Grade F This week: 39 of channels bad (0.11%)