Presentation is loading. Please wait.

Presentation is loading. Please wait.

Joint Project UCB RAL SETI Institute

Similar presentations


Presentation on theme: "Joint Project UCB RAL SETI Institute"— Presentation transcript:

1 Joint Project UCB RAL SETI Institute
1/13/2019 Update on ATA 11/17/08 Joint Project UCB RAL SETI Institute

2 ATA-42 1/13/2019

3 A Lot Has Happened Since May
1/13/2019 Don Backer new Director of RAL, Interim Director of ATA Selected 14/24 External proposals for 450 hours of time on array during 2008 Q3&4 Retrofit program on feeds/Rx underway

4 Dewar/Cryo 12” Dewar Refrigerator LNAs 1/13/2019

5 A Lot Has Happened Since May
1/13/2019 Don Backer new Director of RAL, Interim Director of ATA Selected 14/24 External proposals for 450 hours of time on array during 2008 Q3&4 Retrofit program on feeds/Rx underway Contract between SI-SRI to explore usefulness of ATA for SSA – Task 1 determination of precise orbital ephemerides with correlator and Prelude NSF-URO Reverse Site Visit in August Unfortunately, annual operating funds remains flat at $200K/yr (-10% in 09) Inadequate to support external science program

6 Calibrating for GPS 1/13/2019 Astronomical calibration is at the same frequency as the observation Antenna main lobe “selects” desired source GPS dominates received signal – even in side lobes Need some way to calibrate Change frequencies? (Uncertainty) On GPS itself? (Chicken and egg)

7 Calibration in Neighboring Spectrum
1/13/2019 Measure calibrator in clear L-band spectrum to avoid interference Interpolate coefficients to GPS observing frequency (Coefficients must be well behaved) Challenge: Instrumental Delay and Phase vary as a function of frequency Frequency Phase

8 Predictability with Small Frequency Changes
1/13/2019 Use all available clear spectrum in the same tuning as the desired downlink Reduced calibrator SNR but higher confidence in system characteristics ATA calibration values are well-behaved on 20-MHz scale Currently the best calibration method with minimal error Frequency Phase

9 A Lot Has Happened Since May
1/13/2019 Don Backer new Director of RAL, Interim Director of ATA Selected 14/24 External proposals for 450 hours of time on array during 2008 Q3&4 Retrofit program on feeds/Rx underway Contract between SI-SRI to explore usefulness of ATA for SSA – Task 1 determination of precise orbital ephemerides with correlator and Prelude NSF-URO Reverse Site Visit in August Unfortunately, annual operating funds remains flat at $200K/yr (-10% in 09) Inadequate to support external science program

10 There’s More Fly’s Eye Experiment Continuing development of backends
1/13/2019 Fly’s Eye Experiment Data taking concluded Data analysis almost concluded Continuing development of backends 100 MHz BW Correlator – 64 inputs Being duplicated as we speak 2 independently tunable Beamformers Beamformer #3 by May 09 Real-time fringe rotation Fast data dumping REU summer program at SI – 3 student projects

11 Fly’s Eye Pulse Search 2008 October 29 Goal: Detect the most luminous, rare events in the Universe Concept to hardware install: Oct-Dec ‘07 500 Hours of observing – Feb-Apr ‘08 Supercomputer processing (50 khours) Publication: soon

12 There’s More Fly’s Eye Experiment Continuing development of backends
1/13/2019 Fly’s Eye Experiment Data taking concluded Data analysis almost concluded Continuing development of backends 100 MHz BW Correlator – 64 inputs Being duplicated as we speak 2 independently tunable Beamformers Beamformer #3 by May 09 Real-time fringe rotation Fast data dumping REU summer program at SI – 3 student projects

13 Signal Processing Room
1/13/2019

14 The Reality Is Even Worse!
1/13/2019

15 There’s More Fly’s Eye Experiment Continuing development of backends
1/13/2019 Fly’s Eye Experiment Data taking concluded Data analysis almost concluded Continuing development of backends 100 MHz BW Correlator – 64 inputs Being duplicated as we speak 2 independently tunable Beamformers Beamformer #3 by May 09 Real-time fringe rotation Fast data dumping REU summer program at SI – 3 student projects

16 1/13/2019

17 1% Reproducibility Antenna to Antenna!!
1/13/2019

18 Phase 1 Science 1/13/2019 Transient Sky

19 Transient Radio Sky Exploration of the high-energy universe
2008 October 29 Exploration of the high-energy universe Massive Black Holes Neutron stars Magnetic fields Accretion and outflows The Unknown 20 cm 800 sq Degrees 12 Epochs 19

20 Phase 1 Science 1/13/2019 Transient Sky Hydrogen surveys

21 Hydrogen in Galaxies Surveys
Survey 10 nearby galaxy groups for intergalactic neutral hydrogen. Dark galaxies (no stars), may be found. Survey internal hydrogen content in all ~160 unmapped local galaxies. Local volume study informs studies of distant Universe. 2008 October 29 Sloan Digital Sky Survey 21

22 M81 Group Interaction 1/13/2019 DSS VLA ATA

23 Commensal SETI Demo 1/13/2019 DSS VLA ATA

24 Phase 1 Science Transient Sky Hydrogen surveys
1/13/2019 Transient Sky Hydrogen surveys Beamformer Calibration and Nulling

25 Beamformers Work –Really Well!
1/13/2019 New Horizons X-band 1 Antenna 11 Antennas

26 SETI: Detection of the Most Distant Man-made Object
1/13/2019 December 15, 94 AU

27 SETI: Detection of the Most Distant Man-made Object
1/13/2019 Voyager 1 EIRP ~10 KW  High frequency  Beamformer  SETI signal detect December 15, 94 AU

28 Use Degrees of Freedom On-Axis: Off-Axis: 10dB down Nulled: 28dB down
1/13/2019 On-Axis: Off-Axis: 10dB down Nulled: 28dB down 1 part in 108 of transmission Projection Nulls from 11.4’ – 12.6’

29 Phase 1 Science Transient Sky Hydrogen surveys
1/13/2019 Transient Sky Hydrogen surveys Beamformer Calibration and Nulling Real-time Imaging

30 Welcome to RAPID Rapid Automated Processing and Imaging of Data.
1/13/2019 Rapid Automated Processing and Imaging of Data. Flag, Calibrate, Image, Repeat. 30 30

31 Gains Solution Building
ARTIS 1/13/2019 ARTIS PROTOTYPE Calibrator Source RFI Filtering RFI Data Vital Signs RFI Filtering RFI Phase-up Bad Antennas Bad Baselines Gains Solution Building Phase Solution Amp Solution PB Solution Mapping Self-cal Sol'n Calibrator Mapping Flagging Calibration Map Beam Averaging/Accumulating 31 31

32 Financial Status 1/13/2019 Additional interactions with SRI and USAF may lead to enhanced investigations on use of ATA as a contributing sensor for SSN ~30% time $375K equipment grant May provide ops funding needed for next few years Requested additional construction funding from PGAFF → 128 ($18M or $200K per antenna → 256 ($ 38.5M or $175K per antenna) With construction funding, we can operate successfully operate ATA-42, and grow

33 Survey Telescope Ranking
2008 October 29 ATA-256: “Best in the World” for forseeable future ATA-128: “World Class” as compared with EVLA ATA-42: where we are today

34 What’s Next For ATA Beamformer #3 Higher spectral resolution
1/13/2019 Beamformer #3 Higher spectral resolution Δf = 100MHz/(1024*2N) Increased BW ~600 MHz ADC in collaboration with MeerKat Funded by SDRT

35 SoftwareDefinedRadioTelescope 1.0
1/13/2019 Year 1 SonATA Demo Years 2&3 Initial commitment $1.5M over 3 years --- looking for $9M over 3 years

36 And Not Too Far In Future
1/13/2019 1-25 GHz feed in vacuum Simple coax-connections


Download ppt "Joint Project UCB RAL SETI Institute"

Similar presentations


Ads by Google