Download presentation
Presentation is loading. Please wait.
Published byJosé Antonio Francisco José Barbero Soriano Modified over 6 years ago
1
802.15 Liaison Report Date: 2011-09-23 Authors: September 2011
September 2011January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 September 2011 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
2
Abstract Liaison report on 802.15 as presented to 802.11
September 2008 January 2009September 2008 September 2011January 2009September 2008 doc.: IEEE /xxxxr0 September 2011 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics
3
September 2008 September 2011January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 September 2011 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
4
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 e MAC amendments Initial Sponsor ballot on D6.0 closed August 28, Results were 146/6/ % Affirmative 547 comments received: 324 technical, 204 editorial, 19 general Resolved 479 comments by end of this week Expecting to go out for recirculation in October Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
5
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 f RFID Initial Sponsor ballot on D5.0 closed August 28, Results were 112/3/ % Affirmative 97 comments received: 36 technical Resolved all comments Expecting to go out for recirculation immediately Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
6
802.15.4g Smart Utility Networks
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 g Smart Utility Networks Initial Sponsor ballot on D5.0 closed September 1, Results were 177/10/ % Affirmative 262 comments received: 163 technical, 87 editorial, 12 general Resolved all but 13 comments Expecting to go out for recirculation in October Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
7
802.15.4i Rollup Published as 802.15.4-2011 September 2011
May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 i Rollup Published as Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
8
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 j MBAN Further technical discussions of the 3 proposals with detailed technical information: Channelization PHY changes – Deferred to discussion on reflector MAC changes Reduced Proposals from 3 to 2 LG and Philips announced that they merged their proposals and presented Updated Timeline Updated Proposal Comparison Continue to use as a vehicle for discussion Hoping to go out for initial Ballot after January meeting Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
9
802.15.4k Low Energy Critical Infrastructure Monitoring (LECIM)
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 k Low Energy Critical Infrastructure Monitoring (LECIM) Heard Final proposal presentations Guoliang Yao, Betty Zhao, M. Al Ameen, Ben Rolfe, Sourav Dey, Jon Adams, Kyung Sup Kwak, Seong-Soon Joo, Yong Li, Mi-Kyung Oh, Shusaku Shimada, Shu Kato, Matt Johnson, Xiang Wang, Jean Schwoerer, David Howard Had a panel discussion on proposals Worked on channel model Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
10
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 m TV White Space The TG4m was approved just before Okinawa meeting, and the first meeting was held in September Review the PAR, SG4TV documents Set up future plan and timeline Call for officer nominees Reviewed Canadian TVWS Consultation document, and forwarded TG4m’s comments to the WG chair Discussed how TG4m will provide the technical guidance document to prepare call for Proposals Will provide a draft until end of October through off-line discussion, and will discuss it in November meeting Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
11
802.15.6 Wireless Body Area Networks
September 2008 November 2007 September 2011January 2009September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 September 2011 Wireless Body Area Networks Initial Sponsor ballot on D4.0 closed August 21, Results were 112/12/ % Affirmative 238 comments received: 126 technical, 103 Editorial, 9 General Resolved all but 11 comments Expecting to go out for recirculation before November meeting Submitting PAR revision to change title to “IEEE Standard for Wireless Body Area Networks” Slide 11 Slide 11 Page 11 Page 11 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems
12
Personal Space Communications SG
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 Personal Space Communications SG Heard reports from the PAR subgroup for the new direction Brainstormed a new direction aiming at a new study group Group named the future new study group “PAC (Peer Aware Communications)” Group discussed PAC’s main theme, distinctive features, and applications. Key features: Infrastructureless, Fully Distributed, Peer-to-peer Communications Autonomous Association: (without human intervention ) Discovery signaling rate -typically 100kbps The number of devices in the discovery >100 Data Transmission rate -typically 10 Mbps Group communications: n to m Localization -typically 10m Unlicensed/lightly licensed bands Group drafted a call for presentations for PAC Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
13
Better Use of Spectrum Resources in WPANs IG
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 Better Use of Spectrum Resources in WPANs IG Did not meet (only meets at plenaries) Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
14
Key Management Protocol IG
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 Key Management Protocol IG Finalized PAR and 5C Structure of Recommended Practice KMP Shim and Security Association content Per standard guidelines 15.4, .6, .7, etc. Per KMP guidelines and use cases HIP, IKEv2, 802.1X, SAE, etc. Further refined KMP transport Information Element content Fragmentation/Reassembly methodology No short address creation within KMP Use if available from elsewhere Ready for PAR/5C approval and start of document creation PAR and 5C approved by full WG Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
15
THz IG Did not meet September 2011 September 2008 May 2008
September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 THz IG Did not meet Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
16
WNG Four presentations September 2011
May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 WNG Four presentations Definition and Characteristics of LED-ID ( ) by Yeong Min Jang Case Study for High Speed Data Transmission of LED-ID System ( ) by Yeong Min Jang, (Kyesan Lee) Case Study for Positioning Data Watermarking Scheme using Visible Light ( ) by Yeong Min Jang, (Jaesang Cha) Case Study of Interference Cancellation Method using Unipolar-ZCD code in LED-ID System ( ) by Yeong Min Jang, (Jaesang Cha) Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung
17
References This document All Documents
September 2008 May 2008 September 2011January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2011 References This document All Documents Current draft is in the members-only area Members_Only_Area members log in using username and password Slide 17 Clint Chaplin, Samsung Electronics Page 17 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.