Download presentation
Presentation is loading. Please wait.
1
PAF Risk Register and PARR mapping
8 May 2018
2
PAF Risk Register and PARR mapping
Exercise to map PARR reports to PAF Risks Not every PAC Risk has an associated PARR report associated with it Not every PAC Risk has an associated PARR report produced currently Gemserv
3
PAC Risk Risk Title Source of UIG in 2017/18 AUGS PARR Report Notes
Theft of Gas Permanent/Temporary AUGE Element 4, 6 (Balancing Factor) To be created Request data from AUGE and TRAS PACR0002 Use of the AQ Correction Process Temporary (until Reconciliation) 2A.8, 2B.8 PACR0003 Estimated reads used for daily metered sites (Product Class 1 and 2) 2A.1, 2B.1 PACR0004 Identified LDZ Offtake Measurement Errors Can use Measurement Error Notification data PACR0005 Incorrect or missing asset data on the Supply Point Register Permanent/Temporary (if identified and corrected) 2A.9, 2B.9 2A.2, 2B.2 2A.3, 2A.3 PACR0006 Use of Winter Annual Ratio (WAR) for End User Category (EUC) 03-08 2A.5, 2B.5 PACR0007 Undetected LDZ Offtake Measurement Errors Permanent Reference UNC OAD C3.2 obligation PACR0008 Unregistered Sites Temporary (if identified and corrected) AUGE Element 1, 2 (for iGT sites) Data request from Shipperless and Unregistered Sites Workgroup PACR0009 Shipperless Sites AUGE Element 1 PACR0010 Meter readings fail validation (Product Class 3 and 4) 2A.6, 2B.6 PACR0011 Late check reads on meters that derive a read PACR0012 Meter read submission frequency for Product Class 4 meter points PACR0013 Estimated reads at Change of Shipper 2A.4, 2B.4 PACR0014 Failure to obtain a meter reading within the settlement window 2A.7, 2B.7 PACR0015 Consistent approach to retrospective updates Perm/Temporary (if identified and corrected) 2A.10, 2B.10 Gemserv
4
Current Situation of reporting
Three reports are completed and published on Huddle: 2A.2, 2B.2 - No Meter Recorded 2A.7, 2B.7 - No Reads received for 1, 2, 3 or 4 years (excludes estimated transfer readings) 2A.9, 2B.9 - Standard Correction Factors for sites with AQ > 732 MWH Remaining seven reports creation process to be started by Xoserve following nexus release 2 after June 2018 Gemserv
5
Additional reporting PAC Risk Risk Title PARR Report Notes PACR0001 Theft of Gas To be created Request data from AUGE and TRAS PACR0004 Identified LDZ Offtake Measurement Errors Can use Measurement Error Notification data PACR0007 Undetected LDZ Offtake Measurement Errors Reference UNC OAD C3.2 obligation PACR0008 Unregistered Sites Data request from Shipperless and Unregistered Sites Workgroup PACR0009 Shipperless Sites Five additional reports to be created to ensure appropriate monitoring and controls of PAF Risks Consideration for additional reporting to be defined and created Options for report creation Gemserv
6
Nirav Vyas
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.