Download presentation
Presentation is loading. Please wait.
Published byΣαμψών Γεωργιάδης Modified over 5 years ago
1
SunGuideTM Software Development Project Release 3
SunGuideTM Software Development Project Release 3.1: I-95 Express Lanes Design Review Jan 9-10, 2008
2
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
3
Introductions R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
4
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
5
Meeting Objectives Requirements: Provide a high level review
Provide SwRI’s interpretation (via a design) of the requirements Design High level architectural overview Operator actions and reactions Prototype screens / reports Not an objective: Revise requirements R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 5
6
Release 3.1 and 4.0 Development Activities
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 6
7
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
8
Requirements Review For Phase 1 SwRI is under contract to implement requirements specified in FDOT SWAM #14 For discussion purposes, SwRI will review SWAM #14 requirements converted to SunGuide-SRS Draft R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 8
9
General Admin Editor Requirements
Req. No. Req. Name Requirement Text SunGuide ID FEAT Managed lanes and pricing FEAT Create, view, edit rate schedule table The Admin Editor shall support the creation, viewing and editing of the Rate Schedule Table. ML001A FEAT Set effective data range for rate schedule The Admin Editor shall allow an effective date range to be set for each Rate Schedule to enable Rate Schedules to be input in advance of their active time. ML002A FEAT Configure max/min toll rate change delays The Admin Editor shall support the configuration of the Maximum Toll Rate Change Delay and the Minimum Toll Rate Change Delay parameters for each segment. ML003A FEAT Import rate schedules as files The Admin Editor shall allow importing 'Rate Schedules' in the form of comma-separated values file in a file format to be agreed by the involved parties. ML004A FEAT Assign permissions to override managed lane segments The Admin Editor shall allow the assignment of permissions to manually override managed lanes segments via the Managed Lanes Tab. ML005A FEAT Parameter to associate opening/closing with event The Admin Editor will also allow setting of a parameter to require an opening or closing to be associated with an event. ML006A FEAT Configure managed lanes toll rate DMS The Admin Editor shall allow for the configuration of managed lanes Toll Rate DMS. ML007A FEAT Edit default messages for toll rate signs The Admin editor shall allow editing of the default messages to be displayed on both two DMS and single DMS Toll Rate signs for each override category. ML006D Ability to add, modify and delete Rate Schedules Configure maximum/minimum toll rate change delays Import rate schedules from CSV file Add express lane permissions to allow for overriding Configure Toll Rate Signs Configure default messages for Toll Rate DMSs R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
10
Operator Map Requirements – Managed Lane Tab
Req. No. Req. Name Requirement Text SunGuide ID FEAT7.20 PS FEAT Display managed lane segments SunGuide shall provide operators with a GUI that displays the Managed Lanes segments. ML018U Managed Lane Tab FEAT7.20.1 Button to return segment to normal operation A button shall be provided to allow an authorized user to return a segment to normal (apply Rate Schedule) operation. ML011E FEAT7.20.3 Managed lanes tab for lane operation The SunGuide GUI shall provide a 'Managed Lanes Tab' to operate the lanes. ML001U FEAT Override buttons to set segment to closed or open The Managed Lanes Tab shall provide override buttons to set a segment to Closed or Open (open to all, zero toll) to an operator with appropriate permissions. ML003U FEAT View current rates on a segment The Managed Lanes Tab shall provide a means for a TMC Operator to view the rates currently in effect on a segment. ML006U FEAT View current toll rate DMS messages The Managed Lanes Tab shall provide a means for a TMC Operator to view current Toll Rate DMS messages. ML007U FEAT View pending rate changes The Managed Lanes Tab shall provide a means for a TMC Operator to view any corresponding pending rate changes. ML008U Express Lane tab on Operator Map will be provided for operation of express lanes Override selection to set a segment to “Closed” or “Open” View current effective toll rates for a segment View pending toll rates for a segment R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
11
Operator Map Requirements - Events
Ability to create events in express lanes Include Lane Status DMS in event plans not on express lanes Ability to view events associated with a express lane Req. No. Req. Name Requirement Text SunGuide ID FEAT7.20.4 May select associated active event to apply segment status In order to apply the updated segment status, a user may be required select an associated active event from a drop down list depending on system configuration. ML004U FEAT7.20.5 Field to record a text note A field shall be provided to enable the operator to record a text note to indicate the authorization to switch to the override mode. ML005U FEAT7.20.6 Create events in managed lanes TMC Operators shall be able to create events (blockage, evacuation, etc.) in the managed lanes, in accordance with SunGuide's existing rules for event creation. ML009U FEAT Button per segment to view associated events SunGuide shall provide operators with a button per Managed Lanes segment to view events associated with the selected Managed Lanes segment. ML015U FEAT Include lane status DMS in event plans not on managed lanes TMC Operators shall be able to manually include the Lane Status DMS in a response plan for events not on the managed lanes. ML019U R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
12
Operator Map Requirements – Operator Alerts
Operator alerts will be displayed for the following conditions: Failure to update Toll Rate DMS Failure to communicate with Turnpike Middleware Express lane segment not operating per TOD rate schedule Event terminated if segment still in override mode Req. No. Req. Name Requirement Text SunGuide ID FEAT7.20.2 Alert operator if response message not received If a SunGuide Response Message is not received within a configurable period, SunGuide shall provide an operator alert. ML007I FEAT7.20.7 Provide alarms for managed lane issues The operator interface shall provide alarms for managed lane operational issues. ML010U FEAT Alarm for failure to update toll rate DMS The operator interface shall provide an alarm for managed lane operational issues when there is a failure to update a Toll Rate DMS. ML010U1 FEAT Alarm for failure to communicate toll rate change The operator interface shall provide an alarm for managed lane operational issues where there is a failure to communicate a toll rate change to the Turnpike Middleware within a configurable period. ML010U2 FEAT7.20.8 Alert when segment not operating with TOD schedule SunGuide shall alert the operator at a configurable frequency (e.g. every 5 minutes) when a segment is not operating with the TOD rate schedule. ML011U FEAT7.20.9 Alert when event terminated if segment still in override mode When an event has been associated with a segment override, SunGuide shall alert the operator when the associated event is terminated if the segment is still operating in the override mode. ML012U R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
13
Operator Map Requirements – Toll Rate Signs
Toll Rate DMSs will be treated as special purpose DMSs Express Lanes tab will display current Toll Rate DMS message Message Arbitration System (MAS) will not be used for DMS communication Req. No. Req. Name Requirement Text SunGuide ID FEAT Toll rate DMS treated as special-purpose DMS Toll Rate DMS should be treated as a special-purpose DMS. ML013U FEAT Toll rate DMS only viewable in tab Toll Rate DMS shall be only viewable in the Managed Lanes Tab. ML013U1 FEAT View message displayed on toll rate DMS SunGuide shall provide operators with a GUI to view the message displayed on the Toll Rate DMS. ML016U FEAT33.6.6 Update sign using most direct communications path The managed lanes module shall use the most direct communications path available to update the Toll Rate DMS to ensure this mission critical data is updated with the highest reliability and lowest latency. ML007D FEAT No message arbitration for toll rate DMS The Toll Rate DMS shall not use message arbitration. ML007D1 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
14
Pricing Subsystem (PS) Requirements
Pricing Subsystem (PS) will manage rate schedules and coordinate placement of toll rate messages PS will store an active Rate Schedule for use at all times except during segment closure/opening Amount charged for a segment shall be based on configurable Rate Schedule lookup Req. No. Req. Name Requirement Text SunGuide ID FEAT33 Pricing System (PS) FEAT33.1 General FEAT33.1.1 Manage rate schedules and display SunGuide shall be responsible for managing rate schedules and coordinating Toll Rate DMS rate display and rate selection. ML001 FEAT33.2 Rates FEAT33.2.1 Amount charged based on rate schedule lookup The amount charged for using a segment (or segments) shall be based on configurable 'Rate Schedule' lookup. ML001P FEAT33.2.2 Store single active rate schedule SunGuide shall store a single active 'Rate Schedule' to be used at all times with the exception of segment closures or opening of the segment to all traffic. ML002P FEAT33.2.3 Apply rate schedule to segments while others are closed SunGuide shall be capable of applying the 'Rate Schedule' to certain segments while other segments may be closed. ML003P FEAT33.2.5 Rate schedule time is when rate is displayed The rate schedule time, in rate schedule table, shall be the time the toll rate is first displayed on Toll Rate DMS. ML005P R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
15
Pricing Subsystem Requirements cont’d
Req. No. Req. Name Requirement Text SunGuide ID FEAT33.2.6 Update toll rate DMS according to rate schedule SunGuide shall update all Toll Rate DMS associated with a segment according to the Rate Schedule at the time of each rate change for that segment identified in the corresponding Rate Schedule for that day. ML007P FEAT33.2.7 Calculate and display sum of associated rates Where a Toll Rate DMS is associated with multiple segments, SunGuide shall calculate and display the sum of the associated rates. ML008P FEAT33.2.8 Changes communicated to Middleware according to schedule SunGuide shall communicate toll rate changes to the Turnpike Middleware according to the Rate Schedule. ML009P FEAT33.2.9 Effective time to be offset from schedule times The effective time of a rate change communicated to the Middleware shall be offset from the times in the Rate Schedule to help minimize the chance that drivers are charged more than they viewed on the Toll Rate DMS when entering the facility. ML010P FEAT Delays not added to schedule to create effective time Maximum Toll Rate Change Delay and Minimum Toll Rate Change Delay shall be added to the Rate Schedule time to create the effective time for that rate for the Middleware. ML011P4 FEAT Maximum change delay added to active time The Maximum Toll Rate Change Delay shall be added to the active time for a toll rate sent to the Turnpike Middleware when an increased toll rate is going into effect for that segment. ML011P5 FEAT Minimum change delay added to active time The Minimum Toll Rate Change Delay shall be added to the active time for a toll rate sent to the Turnpike Middleware when a decreased toll rate is going into effect for that segment. ML011P6 If Toll Rate DMS is associated with multiple segments, PS will calculate sum of the associated rates PS will communicate toll rate changes to Turnpike Middleware according to the Rate Schedule PS will use segment rate change delays (maximum and minimum) to determine rate effective time for rates to be sent to Turnpike Middleware R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
16
Turnpike Middleware Interface Requirements
Req. No. Req. Name Requirement Text SunGuide ID FEAT33.3.1 Communication via Turnpike's 'Middleware' Rates shall be communicated to the Turnpike via the Turnpike's 'Middleware' ML002 FEAT33.3.2 Set rate for each system segment SunGuide shall be responsible for setting the rate to be charged on each segment of the system. ML001I FEAT33.3.3 Send 'VariableRate' message to Middleware SunGuide shall accomplish setting the rate to be charged on each segment of the system by sending a 'VariableRate' message to the Turnpike's Middleware no earlier than a configurable period of time before the effective time for that rate and no later than a configurable period of time after the effective time for that rate. ML002I FEAT33.3.4 Send messages once per rate change SunGuide shall attempt to send messages successfully once per rate change. ML003I FEAT33.3.5 Message conform to Middleware That message shall conform to the Middleware's Web Service Definition Language. ML004I FEAT33.3.6 Process receipt or non receipt from Middleware SunGuide shall process the receipt or non receipt of a SunGuide Response Message from the Middleware confirming receipt of the VariableRate message. ML006I FEAT33.3.8 Interface with Middleware to conform to security plan The interface with the Middleware shall conform to the SunGuide Software Security Plan. ML009I PS will interface with Turnpike Middleware via defined Web Service Definition Language (WSDL) PS will process receipt/non receipt of response from Turnpike Middleware Rate change will be sent no earlier than a configurable period of time before the effective time for rate and no later than a configurable period of time after the effective time for rate R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
17
Lane Management Requirements
Req. No. Req. Name Requirement Text SunGuide ID FEAT33.5.1 Declare event on managed lanes SunGuide shall be configured to allow an authorized operator to declare an event on managed lanes using the standard event creation tools. ML001E FEAT33.5.2 Lane status DMS updated for managed lane event If an operator places an event on a managed lane or managed lane segment, SunGuide shall update the managed lanes Lane Status DMS and the general purpose lane DMS using standard SunGuide response plan rules. ML002E FEAT33.5.3 Toll rates follow normal operational rules The Toll Rate DMS and the toll rates communicated to the Turnpike Middleware shall continue to follow normal operational rules regardless of the event entered by an operator. ML003E FEAT33.5.4 Close managed lane segments via operator interface A TMC operator with sufficient permission shall be capable of closing a managed lane segment via the TMC Operator Interface. ML004E FEAT Free toll rate for closed managed lane segment When a managed lanes segment is closed the toll rate shall be set to $0.00 and communicated to the Turnpike Middleware. ML004E1 FEAT Display configurable closed message at segment entry When a managed lanes segment is closed, a configurable closed message shall be displayed on the Toll Rate DMS at the entry to that segment. ML004E2 FEAT Default closed message for managed lanes When a managed lanes segment is closed, the default closed message shall be "LANES" on the top line and "CLOSED" on the second line. ML004E3 Ability to declare events on express lanes Toll Rate DMS and toll rates sent to Turnpike Middleware will continue to operate normally regardless of event entered by user User with override permissions, shall be capable of closing a express lane segment R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
18
Lane Management Requirements cont’d (Close Lanes)
Req. No. Req. Name Requirement Text SunGuide ID FEAT Messages effective at the time of segment closure When a managed lanes segment is closed DMS messages shall be effective at the time the operator applies the segment closure and shall be immediately communicated to the appropriate devices. ML004E4 FEAT Effective time communicated upon segment closure When a managed lanes segment is closed, an editable effective time for toll rates shall be immediately communicated to the Middleware. ML004E5 FEAT Default effective time is when operator applies closure When a managed lanes segment is closed the default effective time for toll rates shall be the time the operator applies the segment closure. ML004E6 FEAT33.5.5 Upstream segment closed when downstream segment is closed If the downstream segment is closed by the TMC Operator, SunGuide shall also close the upstream segment. ML005E FEAT33.5.6 Not automatically close downstream segment If the upstream segment is closed by the TMC Operator, SunGuide shall not automatically close the downstream segment. ML006E FEAT33.5.7 Open managed lanes to all traffic via operator interface A TMC operator with sufficient permission shall be capable of opening a managed lane segment to all traffic via the TMC Operator Interface. ML007E FEAT Free rate when managed lanes opened to all traffic When a managed lanes segment is opened to all traffic, the toll rate shall be set to $0.00 and communicated to the Turnpike Middleware. ML007E1 PS will process the segment closure according to segment closure rules specified Free ($0.00) toll rate Default closed message shall be displayed Upstream segment and downstream segment management User with override permissions, shall be capable of opening a express lane segment R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
19
Lane Management Requirements (Open Lanes)
Req. No. Req. Name Requirement Text SunGuide ID FEAT Display configurable open message at segment entry When a managed lanes segment is opened to all traffic a configurable open message shall be displayed on the Toll Rate DMS at the entry to that segment. ML007E2 FEAT Default message for segment opened to all traffic When a managed lanes segment is opened to all traffic the default open message displayed on the Toll Rate sign shall be "LANES" on the top Toll Rate DMS and "OPEN" on second Toll Rate DMS. ML007E3 FEAT Configurable message for signs with 1 or 2 toll rates When a managed lanes segment is opened to all traffic, the configurable open message shall be available for signs with one or two Toll Rate DMS. ML007E4 FEAT Messages effective when segment opened to all traffic When a managed lanes segment is opened to all traffic, DMS messages shall be effective at the time the operator applies the segment opening and it shall be immediately communicated to the appropriate devices. ML007E5 FEAT Effective time communicated upon opened lanes When a managed lanes segment is opened to all traffic, an editable effective time for toll rates shall be immediately communicated to the Middleware. ML007E6 FEAT Default effective time is when operator opens lane When a managed lanes segment is opened to all traffic the default effective time shall be the time the operator applies the segment opening. ML007E7 FEAT33.5.8 Associate opening/closing segments with event For tracking purposes, opening and closing segments shall be able to be associated with an event through selection of a corresponding event on the operator managed lane interface. ML008E FEAT33.5.9 Require event association before opening/closing lanes The system shall be configurable to allow activation of a feature that requires an opening or closing to be associated with an event before the opening or closing can be applied. ML009E PS will process the segment opening according to segment opening rules specified Free ($0.00) toll rate Default open message shall be displayed Effective time communicated to Turnpike Middleware upon opened lanes Associate opening/closing segments with events Configurable parameter for event association before opening/closing lanes R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
20
Data Archiver Requirements
Data Archive will record: Rate updates and confirmations Override requests Opening/closing information with associated event Req. No. Req. Name Requirement Text SunGuide ID FEAT33.4 Archived data FEAT33.4.2 Maintain history records of rate updates and confirmations SunGuide shall maintain history records in the database of Toll Rate DMS updates and confirmations. ML002S FEAT33.4.3 Maintain history records of override requests SunGuide shall maintain history records in the database of override requests and toll rate messages and confirmations. ML003S FEAT Opening/closing info included with associated event If a managed lanes closure or opening is associated with an event, that event's chronology shall include information on the opening or closing. ML012E R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
21
Toll Viewer Requirements
Web-based application accessible to authorized users Allows the user to specify a managed segment and time span The appropriate rates and DMS messages for the specified criteria will be displayed, providing access to both current and historical data. Req. No. Req. Name Requirement Text SunGuide ID FEAT34.1 Web browser based application A Toll Viewer application shall be developed as a web browser based application. ML001R FEAT34.2 Application accessible by authorized user The Toll Viewer application shall be accessible by an authorized user. ML001R1 FEAT34.3 Retrieve historical DMS rate display The Toll Viewer application shall allow an authorized user to look-up, by date and time period, historical DMS rate display. ML001R2 FEAT34.4 Retrieve historical managed lanes event data The Toll Viewer application shall allow an authorized user to look-up, by date and time period, historical managed lanes event data. ML001R3 FEAT34.5 Retrieve historical segment rate change instruction The Toll Viewer application shall allow an authorized user to look-up, by date and time period, historical segment rate change instruction (request / response). ML001R4 FEAT34.6 Contain DMS rate updates and requests The Toll Viewer shall contain DMS rate updates and requests, and their corresponding triggering rate change information tabulated by time. ML001R5 FEAT34.7 Contain segment rates update messages and confirmations The Toll Viewer shall contain segment rates update messages and confirmations tabulated by time. ML001R6 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
22
Toll Viewer Requirements cont’d
Information about relevant events will also be presented Data will be retrieved from information in the database being stored by SunGuide subsystems (such as Data Archive and Event Management) Two levels of detail, based on user permissions (a more restricted Customer Service Representative view and a more detailed view for operations reviews) Req. No. Req. Name Requirement Text SunGuide ID FEAT34.8 Contain lanes events data The Toll Viewer shall contain relevant managed and general purpose lanes events data to include specific event location, lanes affected during the event, number of lanes at the event location, time event began and ended and the type of event tabulated by time. ML001R7 FEAT34.9 Report event data relevant to location Event data reported via the Toll Viewer shall be relevant by location (E.g. I-95 between mile markers x and y). ML001R8 FEAT34.10 Contain managed lane open, close, and normal operation events The Toll Viewer shall contain managed lane open, close and return to normal operation events tabulated by time. ML001R9 FEAT34.11 Provide two levels of detail The Toll Viewer shall provide two levels of detail, based on user permissions. ML002R FEAT Level for Turnpike customer service representatives The Toll Viewer shall provide one level suitable for Turnpike customer service representatives to confirm what a customer would have experienced when driving on the facility. ML002R1 FEAT Level to support detailed, historical operations reviews The Toll Viewer shall provide one level to support detailed, historical operations reviews. ML002R2 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
23
Requirements Needing Clarification from SWAM #14
Req. No. Req. Name Requirement Text SunGuide ID SwRI Comment General Change ‘Managed Lanes’ to ‘Express Lanes’ Do we need to replace Managed Lanes to Express Lanes throughout SWAM ? FEAT Provide graphical depiction of managed lane segments The Managed Lanes Tab shall provide a graphical depiction of the managed lane segments and their status. ML002U SwRI has mocked up two options for this requirement. FEAT Use message scheduling features The managed lanes module shall use message scheduling features of the Toll Rate DMS. ML007D2 This requirement should be removed from the SWAM since it is no longer valid. Should Lane Status DMSs be treated as special purpose DMSs like Toll Rate DMS ? For purposes of the design, SwRI is assuming we are even though it is not explicitly required in the SWAM. FEAT33.3.3 Send 'VariableRate' message to Middleware SunGuide shall accomplish setting the rate to be charged on each segment of the system by sending a 'VariableRate' message to the Turnpike's Middleware no earlier than a configurable period of time before the effective time for that rate and no later than a configurable period of time after the effective time for that rate. ML002I Remove specific message name from requirement. FEAT33.3.7 Alter rates to be charged for a period For a configurable period of time after sending a VariableRate message, SunGuide shall be able to alter the rates to be charged for a period by sending a revised rate for some or all of a previous period in response to a segment override. ML008I Same as previous. FEAT33.3.8 Interface with Middleware to conform to security plan The interface with the Middleware shall conform to the SunGuide Software Security Plan. ML009I This is a Turnpike Middleware requirement, not a SunGuide requirement. FEAT33.4.1 Maintain history records of configuration changes SunGuide shall maintain history records in the database of all configuration changes. ML001S What is meant by “all configuration changes” ? R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
24
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
25
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
26
FDOT Presentation R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
27
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
28
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
29
I-95 Express Lanes Terminology (SunGuide Perspective)
Express Lanes System – will consist of a number of segments (each possessing no more than two travel lanes). Toll Rate DMS – dedicated to express lanes and may only be used to display toll rates. 1-line, 6 character DMS within the static sign. Toll Rate Sign – composed of one or more Toll Rate DMSs and may have additional static text. Static sign with toll rate DMS(s) installed. Lane Status DMS (Informational DMS) – can be located both before and after a reader gantry to provide express lane status. 1-line, 18 character DMS at the bottom of the static sign. R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 29
30
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
31
Express Lanes Detailed System Overview
Figure From “FDOT High Level SunGuide Requirements For the I-95 Managed Lanes Project” Document R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 31
32
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
33
Admin Editor: Default Override Messages
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 33
34
Admin Editor: Defining Holidays/Special
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 34
35
Admin Editor: Segments
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 35
36
Admin Editor: Daily Rate Schedules
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 36
37
Admin Editor: Import Rate Schedule
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 37
38
Admin Editor: Configure Rate Schedule
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 38
39
Admin Editor: Segment/Rate Schedule Association
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 39
40
Admin Editor: Segment/Rate Schedule Association
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 40
41
Admin Editor: Toll Rate Signs
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 41
42
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
43
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
44
Pricing Subsystem: SunGuide Integration
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
45
Pricing Subsystem: Detailed Architecture
Turnpike Middleware Interface Data Retrieval & Subscription Configuration Pricing Scheduler Data Archiving DMS Message Posting Segment Closure/Opening Database R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
46
Pricing Subsystem: Configuration Handler
Handles Admin Editor changes: Creation, editing and deleting of rate schedules Definition of express lane segments Configuration of Toll Rate Change Delay parameters Configuration of Toll Rate Signs and DMSs R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
47
Pricing Subsystem: Pricing Scheduler
Apply rate changes as determined by the configured rate schedule and segment rate change delay Use segment rate change delays (maximum and minimum) to determine how soon after posting rate increase to DMS signs a rate can actually take effect Determine Toll Rate DMS messages to be posted R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
48
Pricing Subsystem: Segment Handler
Handle closing of express lane segments Send $0.00 toll rate to Turnpike Middleware Send closed message to Toll Rate DMS Handle opening of express lane segments Send $0.00 toll rate to Turnpike Middleware Send open message to Toll Rate DMS Handle association of event id and opening/closure R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
49
Pricing Subsystem: Toll Interface to Turnpike Middleware
Rates and other necessary information will be made effective via XML communication over TCP/IP to to Turnpike Middleware Web Service Interface Send alerts to Operator Map for Turnpike Middleware communication errors R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
50
Pricing Subsystem: Data Archiver
Logs: DMS messages sent and received Turnpike Middleware messages sent and received R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
51
Pricing Subsystem: DMS Subsystem Handler
Update Toll Rate DMS associated with a segment according to rate schedule Messages posted to associated DMS will be configurable to include cost of the segment and/or cumulative total of upcoming segments R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
52
Pricing Subsystem: Database
Persist: Rate Schedules Toll Rate Sign configurations Default messages Toll Rate Change Delay parameters User permissions specific to Express Lanes Closure/opening event data R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
53
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
54
Discussion ? R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
55
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
56
Operator Map Update: General Overview
Appropriate modifications will be made to DMS and Operator Map to allow the map to restrict access to DMS signs being used for tolling messages While status information will be available for these signs, operators will not be allowed to post messages or blank the signs An Express Lane Segment status dialog will be created to allow the operator to view: Current rates in effect Current Toll Rate DMS messages Current Lane Status DMS messages Pending rate changes Current segment override status Two Options – Which option do you prefer ? R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 56
57
Operator Map Option #1 Operator Map Updates
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
58
Operator Map Update: Express Lanes Tab Option #1
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
59
Operator Map Update: Express Lanes Tab Option #1
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
60
Operator Map Option #2 (SwRI Preferred)
Operator Map Updates Operator Map Option #2 (SwRI Preferred) R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
61
Operator Map Update: Express Lanes Tab Option #2
Allowable Selections: Normal Rate Lanes Open Lanes Closed R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
62
Operator Map Update: Express Lanes Alarms
Alerts will be presented to the operator when: Failure to communicate with Toll Rate Signs/DMSs Failure to communicate toll rate change to Turnpike Middleware Express lane segment is not operating with TOD rate schedule When event associated with segment override is terminated R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 62
63
Operator Map Update: Toll Rate DMS Status Screen
Toll Rate and Lane Status DMSs can be in any of the normal SunGuide operational states: Active Error Failed Out of Service This shows the message text to be displayed. The actual DMS size cannot be displayed due to many DMS using variable width fonts R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008 63
64
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
65
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
66
Event Management/RPG EM/RPG Related Requirements in SWAM#14:
ML001E : SunGuide shall be configured to allow an authorized operator to declare an event on managed lanes using the standard event creation tools. ML009E : The system shall be configurable to allow activation of a feature that requires an opening or closing to be associated with an event before the opening or closing can be applied. ML002E : If an operator places an event on a managed lane or managed lane segment, SunGuide shall update the managed lanes Informational DMS and the general purpose lane DMS using standard SunGuide response plan rules. ML009U : TMC Operators shall be able to create events (blockage, evacuation, etc.) in the managed lanes, in accordance with SunGuide’s existing rules for event creation. R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
67
Event Management/RPG Changes Phase 1
Some of this functionality is already supported by SunGuide: Express lanes (a.k.a. HOT lanes) can be configured in EM and marked as blocked when creating/editing Events. RPG templates can be configured for lane status DMS Lane status DMS can be manually added/excluded by an operator after a response plan is generated One small RPG modification is planned for phase one: Response plans will only include Lane Status DMSs for events blocking express lanes Use of double line in the Lane Blockage GUI – requested by D6 No other updates planned for Phase 1 due to schedule constraints R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
68
Event Management/RPG – Event Blocking Express Lanes
To create an event on express lanes: Operator marks one or more “Ht” lanes as blocked The response plan for an event with “Ht” lanes blocked will include lane status DMS R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
69
Event Management/RPG - Event Blocking General Purpose Lanes
The response plan for an event with only general purpose “M” lanes blocked will not include lane status DMS R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
70
Questions? Discussion? Event Management/RPG
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
71
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
72
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
73
Toll Viewer: Overview Web-based application accessible to authorized users Allow the user to specify a express lane segment and time span Existing SunGuide Data Archive Subsystem will be updated to archive: Scheduled rates as they become effective DMS messages as they are posted Operator overrides (segment closures, openings, and return to normal operation events) R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
74
Toll Viewer: Overview cont’d
Two Levels of Reporting General – Turnpike Customer Service Representatives Segment rate update messages and confirmations DMS messages as they are posted Advanced – detailed historical operations reviews Includes general reporting + Relevant express lane event data (e.g. time event began/ended, lanes blocked, etc.) Middleware rate confirmation messages R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
75
Toll Viewer: Login Screen
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
76
Toll Viewer: Search Screen
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
77
Toll Viewer: General View Screen
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
78
Toll Viewer: Advanced User Screen
R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
79
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
80
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
81
Documentation Updates to the following:
SRS (Software Requirements Specification) SDD (Software Design Document) ICD(s) (Interface Control Documents) as appropriate SUM (Software User’s Manual) VDD (Version Description Document) SIP / SICP (Software Integration Plan / Software Integration Case Procedures) Administrator Training R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
82
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
83
Development Schedule Development efforts: Development 16 weeks
Documentation Finalization 2 weeks External Interface Integration 2 weeks FAT 1 week (prep and execution) IV&V 2 weeks (FDOT led activity) Turnpike Test / Field Ops Test 3 weeks (deployment, testing, field ops test) Schedule at a glance: Development Nov 20, 2007 – March 7, 2008 External Interface Integration February 11-29, 2008 Documentation / FAT (San Antonio) March 10-13, 2008 IV&V March 17-28, 2008 Deployment / Field testing March 17, 2008 – April 11, 2008 Schedule Slack April 14, 2008 – April 30, 2008 Operational April 30, 2008 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
84
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
85
Tentative VSL Demo… R3.1 I-95 Express Lanes Design Review
Jan 9-10, 2008
86
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
87
FDOT Presentation R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
88
Agenda Time Item Lead January 9, 2008 January 10, 2008 8:30 – 8:45
Introductions and Opening Remarks Tillander 8:30 – 10:00 Operator Map Updates Misra 8:45 – 9:00 High Level Overview – meeting objectives Heller 10:00 – 10:15 Break 9:00 - 9:45 Requirements Review (ver 2.2) Misra / Heller 10:15 – 12:00 Event Management 9:45 – 10:00 12:00 – 1:30 Lunch 10:00 – 11:45 Overall project status Discussion of “changes” since ver 3.0 Philosophical issues FDOT 1:30 – 3:00 Toll Viewer 11:45 – 1:15 3:00 – 3:15 1:15 – 1:30 I-95 Express Lanes Terminology (SG perspective) 3:15 – 3:30 Documentation 1:30 – 1:45 Architectural Overview 3:30 – 3:50 Schedule Discussion All 1:45 – 3:00 Admin Editor Updates 3:50 – 4:10 SunGuide VSL demo (tentative) SwRI 4:10 – 4:40 Testing 3:15 – 4:30 Pricing Subsystem 4:40 – 5:00 Open Discussion 4:30 – 5:00 R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
89
Discussion ? R3.1 I-95 Express Lanes Design Review Jan 9-10, 2008
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.