DESIGN STATUS PREX II Alan Gavalya 15DEC14
2
Existing Design Shielding concept Collimator concept
Target concept (Hall C designer)
3
Existing Design
4
Remaining Tasks and Challenges
Disassembly will drive the design (ALARA) Access within one month desired (Plug collimator) Shielding needs to be supported (Adding weight to existing support) Verify water shielding in vacuum (Dissipate 3 Watts, no leaks) Design new frame to facilitate disassembly and support added weight
5
Upstream Shielding
6
Complete Shielding Section View
7
Shielding Arrangement
8
Downstream Extension with Collimator and Sieves
9
Elevation Cut Through Downstream Extension
10
Carriage Weldment Section
11
Required Engineering/Design Resource Estimate
Engineer MW Designer MW Detail/Drafter 70 MW Total Man Weeks