Download presentation
Presentation is loading. Please wait.
Published byJulie Stevenson Modified over 6 years ago
1
One quarter of RFQ vessel + vacuum pumps and supports
2
Chopper with vacuum pumps
3
Section of support frame and alignment bench
4
4 part RFQ with RF feed and Chopper
7
Ion source ancillary equipment floating at 75kV
75kV Power Supply, Isolating Transformer and Rack
8
Plan view of new FETS
9
Plan view of R8 with new FETS
10
Position of new FETS relative to existing lead shed
HV Cage Lead Shed Trench Position of new FETS relative to existing lead shed
11
Isometric view of R8 with new FETS
14
End view of new FETS within lead shed
15
Isometric view of existing support frame relative to trench
18
End view of existing FETS in lead shed
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.