Just-In-Time Testing Robert Sabourin President AmiBug.Com, Inc.

Similar presentations


Presentation on theme: "Just-In-Time Testing Robert Sabourin President AmiBug.Com, Inc."— Presentation transcript:

1 Just-In-Time Testing Robert Sabourin President AmiBug.Com, Inc.
Montreal, Canada January 14, 2019 © Robert Sabourin, 2006

2 Just-In-Time Testing Turbulent web development projects experience almost daily requirement changes coupled with frequent changes to user interfaces and the continual integration of new functions and features often using new technologies. This workshop teaches experienced test managers effective techniques which can help keep testing efforts on track while reacting to fast-changing priorities, technologies and requirements. There are no silver bullets – but several simple techniques can be applied to almost any development project enabling successful systematic testing efforts. January 14, 2019 © Robert Sabourin, 2006

3 Just-In-Time Testing After taking this workshop Test managers will be able to Set up key decision making workflows for Test Prioritization and Bug Triage Blend session based exploratory and scripted testing Implement meaningful status tracking and reporting Discover testing objectives, learning what is important to deliver, with or without written requirements Identify sources of information from developers and project stakeholders Adapt testing focus as priorities change, choosing what to test, what not to test, and in what order testing should be done. Identify technical risks and respect business importance Interact with key software engineering workflows Avoid time wasting activities Use systematic approaches to develop some Just-In-Time (JIT) Testing tools and templates and checklists January 14, 2019 © Robert Sabourin, 2006

4 Overview Introduction Some Philosophy Bug Flow Testing Ideas
Test Triage Developers Testing Just In Time Platforms Exploratory Testing Stress Testing Checklists Scenarios Status Bibliography January 14, 2019 © Robert Sabourin, 2006

5 Elevator Parable Robert Sabourin , Software Evangelist President
AmiBug.Com Inc. Montreal, Quebec, Canada January 14, 2019 © Robert Sabourin, 2006

6 Just-In-Time Testing Some Philosophy January 14, 2019
© Robert Sabourin, 2006

7 Fundamental Question How do you know when you are finished?
January 14, 2019 © Robert Sabourin, 2006

8 Crosby on Quality “Quality is defined as conformance to requirements”
“Quality is not a measure of GOODNESS” Phil B. Crosby, Quality is Free January 14, 2019 © Robert Sabourin, 2006

9 Deming Quality approach (PDCA)
Plan, Do Check, and Act: Plan what you want to implement. Do the pilot implementation. Check the results of the pilot. Act on the results by tweaking the process before the next project. January 14, 2019 © Robert Sabourin, 2006

10 Edsger W. Dijkstra “Program testing can be used to show the presence of bugs, but never to show their absence” January 14, 2019 © Robert Sabourin, 2006

11 Boris Beizer “Why software has bugs – the fundamental problem – Programming is a bitch.” The Frozen Keyboard January 14, 2019 © Robert Sabourin, 2006

12 Ken Blanchard “Feedback is the breakfast of champions!”
January 14, 2019 © Robert Sabourin, 2006

13 Watts S. Humphrey “… the job of the software engineer is to deliver high-quality software products at agreed cost and schedule …” “… even the most experienced software engineer injects about one defect for ten lines of code …” January 14, 2019 © Robert Sabourin, 2006

14 Tom DeMarco “You cannot control what you cannot measure.”
January 14, 2019 © Robert Sabourin, 2006

15 C. Northcote Parkinson Parkinson’s Law:
“…work expands so as to fill the time available for its completion…” January 14, 2019 © Robert Sabourin, 2006

16 Yoda "No! Try not, Do. Or do not. There is no try." January 14, 2019
© Robert Sabourin, 2006

17 “…begin with the end in mind …
Steve Covey “…begin with the end in mind … “…first things first …" January 14, 2019 © Robert Sabourin, 2006

18 Purpose of Testing Common definition: Broader definition:
To find bugs before our customers do! Broader definition: The role of testing is to provide objective input to facilitate business decisions! Keeps stakeholders aware of all issues or concerns that relate to shipping a product! January 14, 2019 © Robert Sabourin, 2006

19 Bug Defined To make our job more fun, whenever we have a concern with software, we call it a “bug”. January 14, 2019 © Robert Sabourin, 2006

20 Just-In-Time Testing It’s all about people! (and the occasional bug too) January 14, 2019 © Robert Sabourin, 2006

21 About Bugs Bugs are not Good or Bad January 14, 2019
© Robert Sabourin, 2006

22 About Bugs Some bugs are important and have a high priority!
January 14, 2019 © Robert Sabourin, 2006

23 About Bugs Some bugs are dangerous and have a high severity!
January 14, 2019 © Robert Sabourin, 2006

24 About Bugs Setting the priority and severity of a bug is a business decision Changing business conditions impact the priority and severity of a bug! Always review previous decisions in light of changing business context Ensure staff assigning priority and severity are aware of all relevant business drivers January 14, 2019 © Robert Sabourin, 2006

25 Bug Quadrants January 14, 2019 © Robert Sabourin, 2006

26 Quadrant Changing Same technical bug can be in a different quadrant depending on the business context Monitor business drivers! Focus find and fix high priority/high severity bugs January 14, 2019 © Robert Sabourin, 2006

27 Just for Fun January 14, 2019 © Robert Sabourin, 2006

28 Get Ready, Get Set, Cause here it comes
Just In Time Testing Get Ready, Get Set, Cause here it comes January 14, 2019 © Robert Sabourin, 2006

29 Just-In-Time Testing Turbulence January 14, 2019
© Robert Sabourin, 2006

30 Just-In-Time Testing Unprepared January 14, 2019
© Robert Sabourin, 2006

31 Just-In-Time Testing So what exactly did they throw over the wall?
January 14, 2019 © Robert Sabourin, 2006

32 Getting Things Done Metaphors Themes RUTHLESS TRIAGE RING BELL
WELL OILED MACHINES Themes Parallelism wherever and always Think and test 24/7, early and always Chunking January 14, 2019 © Robert Sabourin, 2006

33 First Things First Begin with the end in mind Gain Consensus Goals
How do we know we are finished? Purpose Why are we doing this project? How will be react to change? Meaning What is a bug? What is a test? January 14, 2019 © Robert Sabourin, 2006

34 Just In Time Testing Bug Flow January 14, 2019 © Robert Sabourin, 2006

35 Bug Flow We will be testing … imagine that we actually find a bug!
What are we going to do about it? How will we decide? When should we decide how to decide? When should we change how we decide? When should we review our past decisions? January 14, 2019 © Robert Sabourin, 2006

36 Bug Flow Identify stakeholders Hunt them out Interview them
Business, Technical, Internal, External Local, International Interview them Learn from them They should be represented but to not have to be involved in all daily aspects of project January 14, 2019 © Robert Sabourin, 2006

37 Keeping Informed Identify sources of information
Ensure at least one person involved directly in bug triage actively reviews each source Each person may have one or more source Each source may have one or more people Information can be direct or synthesized If synthesized or summarized make sure purpose is clear January 14, 2019 © Robert Sabourin, 2006

38 Bug Flow Define priority scheme Define severity scheme Define workflow
Define states of workflow Define states transitions of workflow Ensure all stakeholders buy in Change if context changes January 14, 2019 © Robert Sabourin, 2006

39 Bug Flow How did we do it last time? Did it work?
How should will we do it next time? Do we need to use the same approach to prioritize all bugs? Unit Integration System January 14, 2019 © Robert Sabourin, 2006

40 Bug Flow Light on our feet Effective Agile Systematic Crisp and clear
We have no time to muck around January 14, 2019 © Robert Sabourin, 2006

41 Example Bug Flow The “bug” flow is something like this
bug is discovered in testing or reported from the field a bug report form is completed the bug report form is reviewed the bug report is added to the bug list a decision is made, at a bug review meeting, about whether the bug should be fixed if the bug is fixed then the software is re-tested to reconfirm that the bug has indeed been fixed if the bug is not fixed (on purpose!) then a description of the work around is published or made available to help desk staff January 14, 2019 © Robert Sabourin, 2006

42 Bug Flow Entered Reviewed Prioritized Assigned Unassigned Fixed Closed
REFUSE Entered Reviewed Prioritized Assigned CHECK TRIAGE DESIGNATE CORRECT MANDATE Unassigned Fixed Closed CONFIRM FAILURE January 14, 2019 © Robert Sabourin, 2006

43 Just In Time Testing Testing Ideas January 14, 2019
© Robert Sabourin, 2006

44 Testing Ideas Collect all testing ideas you can find! List Sort
Organize Shuffle January 14, 2019 © Robert Sabourin, 2006

45 Testing Ideas How to find them?
Does system do what it is suppose to do? Does the system do things it is not supposed to? How can the system break? How does the system react to it’s environment? What characteristics must the system conform to? Why have previous or similar projects failed? How have previous or similar systems failed? January 14, 2019 © Robert Sabourin, 2006

46 Testing Ideas Collect testing ideas
From testing ideas build a series of testing objectives (TO) Each can be assigned as work to a tester Each can include all, part of, or multiple testing ideas January 14, 2019 © Robert Sabourin, 2006

47 Testing Ideas Index Cards Each card has a unique id
Can be shuffled and reviewed Can be organized and reorganized Have one testing idea per card Can be sorted, grouped, prioritized and collected Concept of a prioritized heap January 14, 2019 © Robert Sabourin, 2006

48 Testing Ideas Creative approaches Action verbs Mind Maps Soap Operas
Lateral Thinking January 14, 2019 © Robert Sabourin, 2006

49 Testing Ideas Investigative approaches
We become truffle snorting pigs and try to find useful information in all evidence we discover We can even get good ideas from out of date sources January 14, 2019 © Robert Sabourin, 2006

50 Testing Ideas Bug taxonomies Collections of possible bugs
Appendix A of Testing Computer Software, Kaner, Falk, Nguyen Boris Biezer Taxonomy Otto Vinter manages Shopping cart taxonomy Giri Vijayaraghavan January 14, 2019 © Robert Sabourin, 2006

51 Testing Ideas Requirements Use cases Functional requirements
Quality factors Constraints Written requirements Implicit requirements January 14, 2019 © Robert Sabourin, 2006

52 Testing Ideas Usage Scenarios Identify classes of users
Identify how users will use system Describe scenarios Use Story board or similar approaches Identify variations January 14, 2019 © Robert Sabourin, 2006

53 Testing Ideas Functionality Analysis
Requirements, Design or Prototypes can give insights into Domain Analysis Equivalence classes Boundary analysis CRUD January 14, 2019 © Robert Sabourin, 2006

54 Testing Ideas Failure Modes What can break? Reaction to invalid input?
How does software behave in constrained environment? Memory Disk Space Network Bandwidth CPU capacity Shared resources Stress, Load, Volume January 14, 2019 © Robert Sabourin, 2006

55 Quality Factors Importance For Different Web Application Types
January 14, 2019 © Robert Sabourin, 2006

56 Brainstorming Testing Ideas
Min Max Missing Group of people Kick off meeting Individual build list Logging meeting Synergy Estimate size in sessions Identify missing or redundant ideas January 14, 2019 © Robert Sabourin, 2006

57 Testing Ideas Test Data Library Inspired from reality
Logs from previous or similar systems Build up SOAP OPERA life stories Build test data catalogues Organize so test data can be useful January 14, 2019 © Robert Sabourin, 2006

58 Testing Ideas Oracle Collection Strategies to assess correctness
Similar systems Old systems Subject matter experts GURUs Standards January 14, 2019 © Robert Sabourin, 2006

59 Testing Tools Tools Status Dynamic analysis Static analysis
Test engines Home brew with correct skills Danny Faught Open Testware ideas January 14, 2019 © Robert Sabourin, 2006

60 Just In Time Testing Test Triage January 14, 2019
© Robert Sabourin, 2006

61 Which test? Impact estimation For each test idea guesstimate:
benefit of implementation consequence of implementation benefit for not implementing consequence of not implementing How credible are values? January 14, 2019 © Robert Sabourin, 2006

62 Understanding Complex Technology Quantitatively By Tom Gilb
How to Decide? Rank Credibility 0.0 Wild guess, no credibility 0.1 We know it has been done somewhere 0.2 We have one measurement somewhere 0.3 There are several measurements in the estimated range 0.4 The measurements are relevant to our case 0.5 The method of measurement is considered reliable 0.6 We have used the method in-house 0.7 We have reliable measurements in-house 0.8 Reliable in-house measurements correlate to independent external measurements 0.9 We have used the idea on this project and measured it 1.0 Perfect credibility, we have rock solid, contract- guaranteed, long-term, credible experience with this idea on this project and, the results are unlikely to disappear January 14, 2019 © Robert Sabourin, 2006

63 Which test? Test Idea Rejection – What If?
If the cost/benefit does not make business sense then consider implementing: part of the test, could that lead to part of the benefit at a more reasonable cost? more than the stated test, would that generate more benefit? a different test than the stated idea, could that generate more benefit for less cost? January 14, 2019 © Robert Sabourin, 2006

64 Test Triage Test Triage JIT Projects High Frequency
Daily Test Triage Session Experience dictates Early AM (Rob Preference) Late PM (several clients) January 14, 2019 © Robert Sabourin, 2006

65 Test Triage Test Triage Meeting Review Context
Business Technical Information since last triage Test results Bug results New testing ideas January 14, 2019 © Robert Sabourin, 2006

66 Test Triage Allocate Testing Assignments to Testers
Make sure testers know context Best thing to test Best person to test it Best people to explore it Best lead Assign subject matter experts is required Sessions may be scripted or exploratory January 14, 2019 © Robert Sabourin, 2006

67 Test Triage Requirement Triage Change Control Test Triage Bug Flow
Combined Equivalent to CCB Few people Fluid January 14, 2019 © Robert Sabourin, 2006

68 Test Triage Life of a test idea Comes into existence Clarified
Prioritized Test Now (before further testing) Test before shipping Nice to have May be of interest in some future release Not of interest in current form Will never be of interest Integrate into a testing objective January 14, 2019 © Robert Sabourin, 2006

69 Which test is next? Magic crystal ball Ask the question
Given state of project, state of business, state of technology, our abilities, our experience and our history, what we know and what we do not know, what should we test next? How much effort are we willing to spend continuing to test this project? Can we ship yet? January 14, 2019 © Robert Sabourin, 2006

70 Which test is next? Magic crystal ball
If it existed then how would you use it? What question would you ask it? What question would it ask you? January 14, 2019 © Robert Sabourin, 2006

71 Which test is next? Magic crystal ball Discover Example questions
What question to ask? What information to have at hand? Example questions Given these test objectives how many sessions should I dedicate to them? Given that this part of the application is very buggy what should I test otherwise? January 14, 2019 © Robert Sabourin, 2006

72 Deciding what not to test?
Time pressure Should we skip a test? If test failed could system still be of value to some stakeholder? If test was skipped could important bugs have been otherwise found? January 14, 2019 © Robert Sabourin, 2006

73 e-Commerce Search Example
Domain testing Typical scenarios, valid & invalid data Scenarios touch search If scenario test passes we will have knowledge that in some typical cases with valid and invalid data search actually works (2) may be good enough for now January 14, 2019 © Robert Sabourin, 2006

74 Problem with formulas Units? Math? Exposure(i) = Risk * Consequence
Allocation(i) = (Exposure(i)/Total Exposure) * MAX Units? Math? January 14, 2019 © Robert Sabourin, 2006

75 Guidelines and Decisions
To each stakeholder risk of failure consequence of failure value of success how much certainty do we have is it a wild guess or an absolute truth? January 14, 2019 © Robert Sabourin, 2006

76 Sources of Information
Version control system Monitor changes Track where work is Track where stability is Encourage finding defects earlier than system testing Inspections of code, design, requirements Unit Testing Informal code check in peer reviews January 14, 2019 © Robert Sabourin, 2006

77 Just In Time Testing Developers January 14, 2019
© Robert Sabourin, 2006

78 Testability Influence development team before software gets into your hands Can application be controlled by non-gui api for all business functions? Can application logging be controlled and logs viewed by testing? Can everything which can be set or changed be queried programmatically? Is there a static equivalent for dynamic guis? January 14, 2019 © Robert Sabourin, 2006

79 JIT Configuration Management
Make sure that Developers and testers use different test servers Hand off to testing is based on a baseline Smoke test before and after delivery Keep previous build Know the last best build January 14, 2019 © Robert Sabourin, 2006

80 Testing Just In Time January 14, 2019 © Robert Sabourin, 2006

81 Philosophy We have precious little time to run tests!
We must always be prepared! January 14, 2019 © Robert Sabourin, 2006

82 Time January 14, 2019 © Robert Sabourin, 2006

83 Getting Things Done Development BUG REQ FLOW FLOW Release Cycle
- Who manages them? - How are they prioritized? - Where can I find them? - Are the communicated? - Do they get reprioritized? - Are business drivers known? - Are technical risks known? Getting Things Done Development BUG FLOW REQ FLOW - Are builds delivered? - Where do developers work? - Configuration management? - Source control? Baseline? - Transition? Periodic? - Smoke tests? - Owners:Dev IT DBA SQA? - Who manages them? - What are they? - Where can I find them? - When are they updated? - Why are they changing? - How are they evolving? - Do we observe turbulence? Release Cycle January 14, 2019 © Robert Sabourin, 2006

84 Getting Things Done Concern Concern Being Prepared! Being Prepared!
- Information Flow - Information Flow Corporate information Key business drivers Sales Market Finance Corporate information Key business drivers Sales Market Finance - Technology Flow Architecture Technology churn Tools Techniques Training - Requirement Flow Defined Understood Interrupt Poll Prioritize Turbulence Status Truffle - Bug Flow Defined Understood Business Technical Efficient Expedient Reassess - Test Objectives Quality Factors Technical Risk Failure Modes Importance - Test Strategy Plan Analytic Exploratory Checklists Parallel Chunking Scenarios Data - Test Organization Scheduling Staffing Outsourcing Contractors Students - Testing Lab Multi-tier Server Client Platforms Swap Pattern Synchronized - Test Status Bug charts Test Plan Elaboration Status Pass Fail Execution Status January 14, 2019 © Robert Sabourin, 2006

85 Getting Things Done Where tests are run! Developers Desktop
During development task assignments Unit Testing Development Servers During development and integration task assignments Unit and Integration testing Test Lab Servers During Integration and system test assignments Integration and System Testing Staging Servers Acceptance testing As close as possible to live technologies Live Servers Operational system Site monitoring January 14, 2019 © Robert Sabourin, 2006

86 Never update servers when tests are running!
Getting Things Done Where tests are run! Developers Desktop Development Servers Test Lab Servers Staging Servers Live Servers - Synchronize releasing builds from the development team to the testing team! - Ensure a new builds passes the Smoke Test before it replaces the build currently being tested! Never update servers when tests are running! January 14, 2019 © Robert Sabourin, 2006

87 Getting Things Done Test Scheduling Adapt to change
Revised risks? New test objectives? New chunks? Triage Testing Chunks Assign testing chunks to testing team members. Analysis and exploration to more senior team members DAILY Prioritize Bugs Relative business importance of testing objective? Any test objective more important than any other? Track Progress Total budget effort Spread across testing objectives Smoke Test Should the new build be tested at all? On failure continue with previous build in test. FAST Test Each area of functionality has a simple test. Is functional area stable enough to test BUILD Regression Test Does application still work as expected? Did we accidentally break something? Confirmation Test Have bugs really been fixed? Double check in test lab for each bug! Stress Testing How well does the application behave in harsh conditions? Treated as an experiment. January 14, 2019 © Robert Sabourin, 2006

88 Smoke Testing Smoke test is run on a new build of software to make sure all functions operate well enough to continue testing “Turn on a new appliance at the store” January 14, 2019 © Robert Sabourin, 2006

89 FAST Testing Functional Acceptance Simple Tests
Wide in breadth, low in depth Exercise every function of the application at least once January 14, 2019 © Robert Sabourin, 2006

90 Regression Testing Previously executed tests are re-executed against a new version of the application have code changes broken something that used to work have we introduced new defects often automated January 14, 2019 © Robert Sabourin, 2006

91 Confirmation Testing Typically:
Tester confirms that the fixed bug is really fixed in the appropriate software build January 14, 2019 © Robert Sabourin, 2006

92 Getting Things Done Testing Activities Elaboration Exploration
Define test procedure and test cases. Methods, techniques, test cases. All must be repeatable. Exploration Primarily to identify areas of weakness or instability! Use exploratory testing techniques. Execution Follow defined test procedures or execute automated test scripts. While testing identify bugs! (use checklists!) PLATFORM Bug Isolation Narrow down how to repeat bug. Be practical. May need triage to determine if more isolation is needed. Track Progress Track defects Open open over time. (TREND CURVE) Track test chunk status over time. (SPREED SHEET) Stress Test Experiment Execute in collaboration with development. As required report bugs and always report stress test results! January 14, 2019 © Robert Sabourin, 2006

93 Just In Time Testing Exploratory Testing January 14, 2019
© Robert Sabourin, 2006

94 Getting Things Done Wisdom
Exploratory Testing in parallel with elaboration of chunks Elaborate higher priority chunks first Executing chunks as they are elaborated DO NOT WAIT FOR A COMPLETE SET January 14, 2019 © Robert Sabourin, 2006

95 Exploratory Testing Approach formalized by James Bach ( Used in General Functionality and Stability Test Procedure for Windows 2000 Application Certification January 14, 2019 © Robert Sabourin, 2006

96 Mandate to explore William Clark Meriwether Lewis The object of your mission is to explore the Missouri river, & such principal streams of it, as, by its course and communication with the waters of the Pacific ocean...may offer the most direct & practicable water communication across this continent for the purposes of commerce. - Thomas Jefferson's letter to Meriwether Lewis, June 1803 January 14, 2019 © Robert Sabourin, 2006

97 Make intelligent decisions
Take notes about your decisions Map out where you have been Others can use the result January 14, 2019 © Robert Sabourin, 2006

98 Chart as you explore Further exploration yields a good idea of the state of the world! One bit at a time January 14, 2019 © Robert Sabourin, 2006

99 Exploration Notes - Tabular - Chronological - Schematic - Point form
- Concise January 14, 2019 © Robert Sabourin, 2006

100 Exploratory Testing Test cases
Not known in advance Defined & executed “on the fly” while you learn about the product Testers need to “hone up” their skills in making maps! Consistent note taking style Practice We need to have a standard template Uniform way to capture details January 14, 2019 © Robert Sabourin, 2006

101 Exploratory Testing During test we must capture
Function, options or sub-functions being explored Test cases attempted Comments, notes, images or attachments Hints, reminders and observations which may be useful to future testers Date, Platform, Build or Configuration under test Name of person running test Oracles, “strategy to assess correctness” Other relevant details January 14, 2019 © Robert Sabourin, 2006

102 An Exploratory Test Process
Confirm Test Objective Ensure context known Ensure HW and SW OK All tools available Kick Off Chunk of 90 to 120 min Test, Plan, Discover Prepare Run Wrap up Collect all notes data Complete Review results with Test Lead Review Follow Up Reassess goals Piece together map January 14, 2019 © Robert Sabourin, 2006

103 Just In Time Testing Stress Testing January 14, 2019
© Robert Sabourin, 2006

104 Testing operational characteristics of an application within a harshly constrained environment
Limit processor speed Low memory, disk space Diminished access to shared resources Physical Environment, Static, Temperature, Humidity What is Stress Testing? January 14, 2019 © Robert Sabourin, 2006

105 Stress Testing January 14, 2019 © Robert Sabourin, 2006

106 January 14, 2019 © Robert Sabourin, 2006

107 Just In Time Testing Checklists January 14, 2019
© Robert Sabourin, 2006

108 Checklists Develop a series of one page testing check lists
Aid testing user interface Train team how to use these checklists A checklist violation should be reported as a bug January 14, 2019 © Robert Sabourin, 2006

109 Checklists Remember the three Cs CLEAR CONCISE CONSISTENT
January 14, 2019 © Robert Sabourin, 2006

110 Checklist Do not blindly use web checklists
There are many wonderful examples These may be interesting and inspire you, but unless the same list is used by authors developing documents they can be deceptive and misleading January 14, 2019 © Robert Sabourin, 2006

111 Just In Time Testing Scenarios January 14, 2019
© Robert Sabourin, 2006

112 Scenario Based Testing
Scenarios Your testing department should develop a series of typical, real, usage scenarios for each user type Can be done in parallel with development effort Could be based on Use Case Analysis Could be based on Story Boards Testing chunks can be dedicated to scenario elaboration or execution Elaboration (scripting) by testing professionals Execution by contractors, students, support staff etc Lots of parallelism! Individual scenarios can cover many functions! January 14, 2019 © Robert Sabourin, 2006

113 January 14, 2019 © Robert Sabourin, 2006

114 January 14, 2019 © Robert Sabourin, 2006

115 January 14, 2019 © Robert Sabourin, 2006

116 Scenario Based Testing
User Experience Test Case Parameterize experience Walk through scenario from start to end Use pre selected input for each case Always run every test as if it were a user experience January 14, 2019 © Robert Sabourin, 2006

117 Just In Time Testing Status January 14, 2019 © Robert Sabourin, 2006

118 JIT Status Reporting Status Test Objectives Test Results Scoreboard
Bug Summary What we know What is left to do January 14, 2019 © Robert Sabourin, 2006

119 JIT Status January 14, 2019 © Robert Sabourin, 2006

120 JIT Status January 14, 2019 © Robert Sabourin, 2006

121 JIT Status Test Lead Must Track Efforts Every Day!
Number of Tests to elaborate? Number of Tests Passed? Number of Tests Failed? Number of High Priority Bugs to be fixed? Number of Bug Fixes to confirm? Count every day and plot trend graphs! Publish results. January 14, 2019 © Robert Sabourin, 2006

122 JIT Status Trend Chart Open Bugs January 14, 2019
© Robert Sabourin, 2006

123 JIT Status Trend Chart Open Bugs By Type January 14, 2019
© Robert Sabourin, 2006

124 JIT Status Testing Schedule January 14, 2019 © Robert Sabourin, 2006

125 Finished? How do you know you are finished? January 14, 2019
© Robert Sabourin, 2006

126 You know you are finished when …
… the only bugs left are the ones are acceptable (based on your objective test team input) ... January 14, 2019 © Robert Sabourin, 2006

127 You know you are finished when …
… the only bugs left are the ones are acceptable (based on your objective test team input) ... At least for now! January 14, 2019 © Robert Sabourin, 2006

128 Thank You Questions? January 14, 2019 © Robert Sabourin, 2006