Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tech·Ed North America /14/2019 3:30 PM

Similar presentations


Presentation on theme: "Tech·Ed North America /14/2019 3:30 PM"— Presentation transcript:

1 Tech·Ed North America 2009 1/14/2019 3:30 PM
© 2009 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

2 From Zero to Live Migration
Tech·Ed  North America 2009 1/14/2019 3:30 PM From Zero to Live Migration Jeff Woolsey Principal Group Program Manager Windows Server, Hyper-V Mike Sterling Program Manager Windows Server, Hyper-V © 2009 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

3 Agenda Overview of Live Migration
1/14/2019 3:30 PM Agenda Overview of Live Migration Typical Live Migration customer scenarios Technology overview (Live Migration) Storage management during Live Migration Walkthrough: setting up Live Migration Best practices for setting up Live Migration © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

4 Live Migration is a planned failover solution
What is Live Migration? Move a running virtual machine from one host to another host with no perceived downtime for the VM VM is not aware of the migration Maintain TCP connections of the guest OS Building block for Dynamic Data Center through business agility, cost reduction and increase in productivity VM is treated as a black box How is it different from Quick Migration? VM is saved and restored on destination Results in downtime for applications/workloads running inside VMs Both leverage same storage infrastructure – easy to move from QM to LM Live Migration is a planned failover solution

5 Key scenario 1: Host servicing
Live Migrate VMs from source to destination Service Source – patching or hardware servicing, no downtime seen by VMs on destination Live Migrate VMs from back from destination to source No workload downtime during maintenance window

6 Key scenario 2: Load Balancing
SCVMM 2008 R2 driven by PRO (Performance Resource Optimization) can dynamically live migrate VMs to meet changing load

7 Key scenario 3: Green IT – Power Management
During business hours, both servers are in use

8 Key scenario 3: Green IT – Power Management
During off-peak or non-business hours, number of clients go down

9 Key scenario 3: Green IT – Power Management
Following day as business starts, load/demand go up, VMs are live migrated back

10 How Does Live Migration Work?
Prerequisites: Source and Destination computers running WS08 R2 Source and destination nodes must be part of a Failover Cluster Files used by the VM must be located on shared storage Failover Cluster Source Node Destination Node .BIN .VSV .XML .VHD Storage

11 How Does Live Migration Work?
Phase 1: Setup Create TCP connection between source and destination nodes Transfer VM configuration data to destination node Create a new VM on the destination node Configuration Data Source Node Destination Node .BIN .VSV .XML .VHD Network Storage

12 How Does Live Migration Work?
Phase 2: Memory transfer Transfer the content of the VMs memory to the destination node Track pages modified by the VM, retransfer these pages Pause the VM before the final transfer pass Memory Content Source Node Destination Node .BIN .VSV .XML .VHD Network Storage

13 How Does Live Migration Work?
Phase 3: State transfer and VM restore Save register and device state of VM on source node Transfer running state and storage ownership to destination node Start running VM on destination node Cleanup VM on source node Running State Source Node Destination Node .BIN .VSV .XML .VHD Network Storage

14 Storage Management During Live Migration
Live Migration requires VMs to use shared storage SAN LUNs managed by the Failover Clustering service Traditionally, each VM needs its own LUN Volumes cannot be concurrently mounted on multiple nodes SAN .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD

15 Storage Management During Live Migration
The migration of a VM with a dedicated LUN requires that the ownership of the LUN is moved from the source to the destination node Time-consuming, requires the volumes on the LUN to be offlined on the source node and onlined on the destination node Is part of the blackout period SAN .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD

16 Cluster Shared Volumes (CSV)
New feature of Failover Clustering in Windows Server 2008 R2 Single consistent namespace for the volumes on all nodes %SystemDrive%\ClusterStorage\VolumeX SAN .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD

17 CSV and Live Migration Moving the files of a VM during a migration becomes as simple as closing the files on the source node and opening the files on the destination node Additionally, CSV significantly simplifies the administration of the SAN SAN .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD .BIN .VSV .XML .VHD

18 Mike Sterling Program Manager Virtualization
1/14/2019 3:30 PM Setting Up Live Migration Mike Sterling Program Manager Virtualization © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

19 Demo Configuration My Demo: Best Practices: Cluster Nodes: Storage:
Dell Optiplex 745 Quad Core, 8 GB RAM Storage: Dell SC1430 3 x 160 GB Disk, RAID Microsoft iSCSI Target Networking: Multiple Gigabit Interfaces on server, single on node Other: All running Windows Server 2008 R2 Best Practices: Cluster Nodes: Hardware with Windows Logo + Failover Cluster Configuration Program (FCCP) Storage: Storage with Windows Logo + FCCP Networking: Multiple Gigabit Interfaces CSV uses separate network Other: All running Windows Server 2008 R2

20 Storage Requirements CSV + Live Migration Other solutions include:
Required? No Recommended? Yes Other solutions include: 3rd party Clustered File System SanBolic Melios HP PolyServe

21 Demo Environment Overview
DEMO-NODE1 DEMO-NODE2 Gigabit Switch Orange: DC Grey: HOST-001 (Not domain joined) Internet

22 Live Migration via CSV: Step 1
Install WS08 R2 on all systems Add Hyper-V Role Install WS08R2 VM on Storage Server Will act as DC for the demo Domain required for failover clustering Add failover clustering role on cluster nodes Run DCPromo on VM Join machines to domain Optional: Add DHCP role

23 Live Migration via CSV: Step 2
iSCSI Target Configuration Microsoft iSCSI Software Target Included in Windows Storage Server – now available for MSDN/TechNet subscribers! Alternative iSCSI Targets Starwind iSCSI Target SANFly Create Volumes 1 GB for quorum Remainder for CSV Ensure bindings are correct!

24 Live Migration via CSV: Step 3
Configure Networking on nodes Create Hyper-V External Virtual Network Assign Static IP to Virtual NIC Launch iSCSI Control Panel Start -> Administrative Tools -> iSCSI Initiator Log in to iSCSI target

25 Live Migration via CSV: Step 4
Create iSCSI Target for cluster Use IQN (iSCSI Qualified Name) Add both cluster nodes Assign volumes to target From Node 1, open Disk Management and online / format disks Disk 1: Letter Q, Label: Quorum Disk 2: Letter S, Label: CSV Ensure that “Add this connection to the list of Favorite Targets” is set!

26 Live Migration via CSV: Step 5
Open Failover Cluster Manager Form Cluster Cluster Validation Wizard Enable CSV Add Disk to CSV

27 Live Migration via CSV: Step 6
Create VM on CSV volume (c:\clustervolume\volume1) Add as cluster resource Power on VM Live Migrate!

28 Changes at WS08R2 RTM Need multiple NIC’s if using iSCSI
NIC 1: Normal Network Traffic NIC 2: iSCSI Traffic NIC 3: CSV Traffic

29 Hyper-V R2 & SCVMM 2008 R2 Live Migration & HA and Maintenance Mode

30 RC available end of May; RTM within 60 days of WS2008 R2
A centralized, heterogeneous management solution for the virtual datacenter Support for new WS2008 R2 features Live migration: Includes compatibility checks Network optimization: VMQ and Chimney Hot add/remove of VHDs, Pass-through disks Storage migration (migrate storage of running VM) Rapid provisioning (templates) Support for CFS (CSV and 3rd party solutions) SAN-related enhancements Migration in and out of clusters Support for single target iSCSI with multiple LUNs Host maintenance mode (host evaluation) VDI (RDS integration) RC available end of May; RTM within 60 days of WS2008 R2

31 TechReady7 Breakout Chalktalk Template
1/14/2019 Maintenance Mode Apply to all host and host clusters Two options Save-state (no migration) Live-migrate all running HA VMs and save-state for non-HA running VMs © 2008 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

32 TechReady7 Breakout Chalktalk Template
1/14/2019 In Maintenance Mode When host is in maintenance mode, Host state is not monitored; No VM creation is allowed; No VM can be moved into the host; Host is excluded from any placement. What can users do? Request to remove host; Request to start / stop VMs; Request to change host properties; Request to move VM out of the host; … © 2008 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

33 TechReady7 Breakout Chalktalk Template
1/14/2019 Exit Maintenance Mode When host is taken out of maintenance mode, The next host refresher will update host to its current state; No VM is auto-migrated back; No VM is auto-restarted; Host is now available for placement. © 2008 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

34 Microsoft Hyper-V Server R2
1/14/2019 3:30 PM Microsoft Hyper-V Server R2 © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

35 Microsoft Hyper-V Server V2 New Features
Live Migration High Availability New Processor Support Second Level Address Translation Core Parking Networking Enhancements TCP/IP Offload Support VMQ & Jumbo Frame Support Hot Add/Remove virtual storage Enhancements to SCONFIG Enhanced scalability

36 Manage Remotely… 1/14/2019 3:30 PM
© 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.

37 Live Migration $$ Comparison
Hyper-V Server R2 VMware vSphere 3 Node Cluster 2 Socket Servers Free $13,470 4 Socket Servers $26,940 5 Node Cluster $22,450 $44,900 For $500 add VMM 2008 R2 (Workgroup Edition) to manage MS Hyper-V Server R2: Physical to Virtual Conversion (P2V); Quick Storage Migration; Library Management; Heterogeneous Management; PowerShell Automation; Self-Service Portal and more…

38 question & answer

39 Resources Required Slide Speakers, www.microsoft.com/teched
TechEd 2009 is not producing a DVD. Please announce that attendees can access session recordings at TechEd Online. Resources Sessions On-Demand & Community Microsoft Certification & Training Resources Resources for IT Professionals Resources for Developers Microsoft Certification and Training Resources

40 Complete an evaluation on CommNet and enter to win!
Required Slide Complete an evaluation on CommNet and enter to win!

41 1/14/2019 3:30 PM © 2009 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION. © 2007 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries. The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation. MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.


Download ppt "Tech·Ed North America /14/2019 3:30 PM"

Similar presentations


Ads by Google