Presentation is loading. Please wait.

Presentation is loading. Please wait.

4QC Progress Report for IPSG London

Similar presentations


Presentation on theme: "4QC Progress Report for IPSG London"— Presentation transcript:

1 4QC Progress Report for IPSG 1-2.9.2005 London

2 THEMES SUBTHEMES Delivering Strategy Ensuring Productivity
Fostering Responsiveness Managing Knowledge CROSS CUTTING THEMES Implementing the Lisbon Strategy New version of CAF

3 KEY NOTES and AGORAS 15 Agoras ( 3 x 5 )
Altogether ten key note speakers 15 Agoras ( 3 x 5 ) Plan to have both ready by the end of the year 2005

4 BEST PRACTICE WORKSHOPS
Agreed dead line 15th of January 2006 Scientific Rapporteurs will give feed back Suggestion for a role to IPSG-members Draft Workshop Manual distributed

5 SCIENTIFIC RAPPORTEURS
Same team as in Rotterdam (Bouckaert, Pollitt, Löffler) They will go through the Agora presentations as well as BP-presentations Report at the conference 27th Sep 2006 Report at the IPSG-meeting in Helsinki 26th of Oct 2006

6 MARKETING Website is open and now includes BP-cases from 1QC, 2QC and 3QC 2nd Call (draft) has been distributed to IPSG-members, the final version will be distributed in member countries in October A 4QC e-newsletter will be available for those interested with information on conference preparations and the City of Tampere


Download ppt "4QC Progress Report for IPSG London"

Similar presentations


Ads by Google