Presentation is loading. Please wait.

Presentation is loading. Please wait.

Electrocorder Power Loggers

Similar presentations


Presentation on theme: "Electrocorder Power Loggers"— Presentation transcript:

1 Electrocorder Power Loggers
Power & Energy Logging for 90% of your needs!

2 Electrocorder >90% of issues are loading or PF problems.
(only simple logger needed, the Electrocorder. No need to use a high-end power logger (E.G. Fluke) to log flicker or harmonics) <10% involve flicker, harmonics or transients. (high-end PQ logging is indeed needed!)

3 What are the ‘common power issues’?
Poor voltage due to overloading. Need to monitor load versus capacity. Need to reduce energy via auditing. Need to investigate peak lopping. Need to monitor or correct PF (power factor).

4 Our Philosophy Why use $20k worth of kit for simple issues when you can use $2k? Risk damage, theft, wear & tear, users need training,….. Use cost effective loggers to filter your issues. 9/10 of your loggers should be Electrocorders. The main selling point, is that Electrocorders are very cost effective, you can have 10 or 20 units for the price of a single Fluke logger! Use this to buy bulk, allowing users to quickly and easily address issues and complaints.

5 Key Markets Electrical Contractor Power Utilities (national/local)
Engineering Site Engineers Energy Auditors Voltage Optimisation Companies The main selling point, is that Electrocorders are very cost effective, you can have 10 or 20 units for the price of a single Fluke logger! Use this to buy bulk, allowing users to quickly and easily address issues and compliants.

6 If you have these ‘basic power issues’
Invest in an Electrocorder 3 Phase Power (600V) - EC-7VAR-RS 1 Phase Power (300V) - EC-2VA 1 Phase ‘domestic’ equipment - AL-2VA. Most, the majority, of electrical power issues can be dealt with using an Electrocorder.


Download ppt "Electrocorder Power Loggers"

Similar presentations


Ads by Google