Download presentation
Presentation is loading. Please wait.
Published byCarmella Fox Modified over 6 years ago
1
Project Tiers (Projects and Subprojects / Related Projects)
Client Webinar Series Time to Reach New Heights Project Tiers (Projects and Subprojects / Related Projects) July 13, 2017
2
Agenda Project ID Project Subtype Programs Reference Project Manager
We’ll Go Over … Project ID Project Subtype Programs Reference Project Manager Linked Project (Parent-Child) Data Project Location Divisions
3
Project ID Here’s some Ideas: Pick a segment to use for “grouping”
Use the % wildcard in the project id lookup Note: the Lookup supports Project ID mask GC% finds all projects that start with GC %00 finds all projects that end with 00 %99% finds all project that contain 99 __C% finds all projects with A in the third position Adding a “last” segment of 1 or 2 characters/digits 00 for the Base Project; 01, 02 for the “add-ons” 0 for the Base; A, B, C for the “add-ons”
4
Mask Maintenance Max Length = 16 Segments = up to 6 AD Adminsitrative
CO Construction Consulting CX Capital Expenditures EN Construction Engineering EQ Equipment ER Equipment Rental EV Event Construction GC General Contracting HH Hotel MF Design Build MK Construction Program Mgmt PC Mechanical PS Professional Services SC Electrical SS Building Automation SW Industrial WO Retail XX Templates
5
Project Subtype Screens Executive Dashboard Template Library
Catalog Filter Rule Group: Catalog Folder Filter
6
Programs Create a Program Add the Projects to the Programs
Project Setup | Project tab System Admin | Program tool A Project can be included in multiple programs Screens: Executive Dashboard Filter by Program Reports: Project Log
7
Reference Reference – designed for “you” to define Reports Two flavors
Global Reference – across all documents Doc Reference – Doc Type specifics Reports Document Log (Doc Reference) RFI Log (Doc Reference)
8
Project Manager Executive Dashboard Reports: Filter by PM
Change in Profit Supplemental Workbook Company Snapshot Supplemental Workbook Reports: Project Log Implementation Resources include these sample Executive Dashboard Supplemental Workbooks Billed to Date Change in Profit Company Snapshot Project Financial Review
9
Linked Projects Use the Attach a Project icon on the Attachments tab of the Project Setup document to link a “child” project to its “parent” project.
10
Data Project You can think of this two ways:
Your goal is to create a quick reference, not recreate the Catalog tab… You can think of this two ways: What Catalog options don’t you want the user to change What Catalog options do you want to hide so the user doesn’t have to deal with a lot of choices/clutter Lock allows you to remove (hide) some of the Catalog search options, for example: Closed (Include Closed option) Documents (on a File tab, you may want to block the user from clicking Include Documents) Project Doc Status And so on.
11
Location Latitude and Longitude Reports Projects Nearby
12
Division Reports: Executive Dashboard Project Cost by Account Category
Project WIP Executive Dashboard Filter by Division
13
Branding Outbound Email
Next Topic Branding Outbound August 10th – 1:00 pm EDT Be sure to check your Inbox for the Spitfire Monthly Newsletter; it’s full of tips and info on our newest features. Not receiving our newsletter? Just send an to and we’ll add you to the list.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.