1
Beam Instrumentation R&D
Sui Yanfeng On behalf of CEPC BI Group Beijing, China
2
Outline Introduction of CEPC beam position monitor BPM electronics R&D
Signal distribution study Rear Transition Module(RTM) Advanced Mezzanine Card(AMC)
3
Introduction of CEPC beam position monitor (BPM)
To provide the beam position and orbit, the base of other machine parameters measurement Apart from some specific BPMs, there will be one BPM for each Q-magnet, the total number of BPM is 2324 in storage ring There are 1436 BPMs in booster and 70 BPMs in linac.
4
Motivation To reduce the budget of BI system, due to a large number of beam position monitors and the high price of commercial products. Customized for different part of CEPC. Booster, Linac and storage ring. Easy to maintain and upgrade.
5
Efforts of BPM electronic
The electronic development is divided into two parts: signal distribution and BPM electronics. + Signal distribution electronics BPM electronics
6
Signal distribution study
Amplitude and discriminator method Amplitude and high speed ADC method
7
Signal distribution study
Using the system clock and system trigger to distribution the different signal
8
The BPM electronics Micro TCA.4 “AMC+RTM” DBPM_AMC DBPM_RTM
9
Efforts of RTM electronic
10
Test of RTM electronic v1.0
Before: -40dBm After: -52dBm Space signal crosstalk is the main interference !
11
The modification of the RTM V2.0
Add on Quasi-Crossbar Switch Exchange amplifier Control logic circuit Power supply optimization 。。。
12
Test of RTM electronic v2.0
RTM V1.0 and V2.0 is finished Bandpass performance RTM V1.0 Bandpass performance RTM V2.0 Significant promotion in bandpass performance and flatness! 2016粒子加速物理与技术实验室年会
13
The temperature of RTM Non shielding 37.5℃ After shielded 26.9℃
2016粒子加速物理与技术实验室年会
14
RF interference shielding cover
1、Shielding RF 2、help cooling down PCB 2016粒子加速物理与技术实验室年会
15
Efforts of AMC electronic
AMC version 1.0 PCB welding(finished) Power supply debugging ( finished ) FPGA loading and debugging ( finished ) ADC & clock( In progress)
16
AMC PCB board and welding
17
AMC debugging
18
The modification of the AMC
Modify PS to solve overheated FLASH memory; Clock circuit; Global reset function; 。。。
19
Signal processing and algorithm
Xilinx System Generator 结合Matlab实现 The simulation of TBT、COD and Fast modes are finished in Matlab
20
Signal processing and algorithm
The result of TBT Mode DDC后频谱 经CORDIC后频谱 1
21
Plan of this year Signal distribution solution
Joint debugging of RTM and AMC Verify signal processing and algorithm in commercial Macro TCA platform
22
Acknowledgement Thanks to the DBPM R&D Group: Wei Shujun, Du Yaoyao, Ma Huizhou, Liu Fang, Zhang Peng, Wang Zhizhuo. Thanks also give people who shares pictures of this talk.
Similar presentations