Download presentation
Presentation is loading. Please wait.
1
May 802.19 Liaison Report Date: 2009-05-13 Authors: May 2009
October 2006 doc.: IEEE /1560r1 May 2009 May Liaison Report Date: Authors: Eldad Perahia (Intel) Matthew Fischer (Broadcom)
2
Abstract May 802.19 liaison report May 2009 October 2006
doc.: IEEE /1560r1 May 2009 Abstract May liaison report Eldad Perahia (Intel) Matthew Fischer (Broadcom)
3
TV White Space Coexistence Study Group
May 2009 TV White Space Coexistence Study Group At the March Plenary the TVWS Executive Committee Study Group recommended formation of a study group on TVWS coexistence The EC approved formation of the TVWS Coexistence Study Group No plan to develop a PAR at this point EC requested a plan and schedule SG held weekly conference calls SG discussed possible SG deliverables SG held straw poll on possible SG deliverables Eldad Perahia (Intel)
4
Study Group Selection of Deliverables
May 2009 May 2009 Study Group Selection of Deliverables Deliverable Study Group Plan Use Cases and Coexistence Scenarios Develop Coexistence Metrics Defer Coexistence Mechanisms Incumbent Protection SG Plan provided in document /10r3 Slide 4 Steve Shellhammer, Qualcomm Eldad Perahia (Intel)
5
May 2009 Plans for this Week Eldad Perahia (Intel)
6
Future 802.19 Conference Calls
October 2006 doc.: IEEE /1560r1 May 2009 Future Conference Calls Visit website for latest information on call information Eldad Perahia (Intel) Matthew Fischer (Broadcom)
7
May 2009 References 19-09/0010r3, TV White Space Coexistence Plan, r0, May Opening Report, Eldad Perahia (Intel)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.