1 Direct and indirect inputs Working Group C Groundwater
GW3 Drafting Group Chair: W. GEVAERTS (NICOLE) Co-Chair: T. TRACK (DECHEMA) Co-Chair: R. EIKELBOOM (NL)

2 © GW III

3 Direct inputs

4 Indirect inputs

5 Direct and indirect inputs
Potential input (def. GWDD) Prevention and limitation Chapter 7

6 Point of compliance - POC
Virtual or real point, used in risk assessment (by modelling and/ or monitoring), where certain criteria should be met. E.g. specified limit values or a ban. A POC may also be part of a formal procedure (e.g. link with other directives, permits….).

7 Direct and indirect inputs
Input assessment via POC 1 Potential input (def. GWDD) yes Direct/indirect input Chapter 4 Prevention and limitation no No action Chapter 7

8 Points of compliance

9 Points of compliance

10 Direct and indirect inputs
Input assessment via POC 1 Potential input (def. GWDD) yes Direct/indirect input Define POC 3 (process based) + assessment Chapter 4 Prevention and limitation no No action Chapter 7

11 Points of compliance

12 Points of compliance

13 Direct and indirect inputs
Input assessment via POC 1 Potential input (def. GWDD) yes Direct/indirect input Define POC 3 (process based) + assessment Chapter 4 Prevention and limitation Problem at POC 3 ? no No action no Chapter 7 yes Chapter 5.4 Risk assessment to define POC 2 and 4

14 Points of compliance

15 Points of compliance

16 Direct and indirect inputs
Input assessment via POC 1 Potential input (def. GWDD) yes Direct/indirect input Define POC 3 (process based) + assessment Chapter 4 Prevention and limitation Problem at POC 3 ? no No action no Chapter 7 no yes Chapter 5.4 Problem at POC 2 or 4 ? Risk assessment to define measures yes Defensive monitoring at POC 2 and 4 Risk assessment to define POC 2 and 4 Chapter 5

17 Direct and indirect inputs
Input assessment via POC 1 Potential input (def. GWDD) yes Direct/indirect input Define POC 3 (process based) + assessment Chapter 4 Prevention and limitation Problem at POC 3 ? no No action no For new instalatations with hazardous compounds Chapter 7 no yes Chapter 5.4 Problem at POC 2 or 4 ? Risk assessment to define measures yes Defensive monitoring at POC 2 and 4 Risk assessment to define POC 2 and 4 Chapter 5

18 Table of contents 1 Introduction 2 Background 3 General Principles
4 Definition of Direct and Indirect input 5 Defensive monitoring requirements 6 Links to other WG C Drafting Groups and other legislation 7 Prevention and limitation measures Annex Spreading (Transport) processes in the unsaturated zone Spreading (Transport) processes in the saturated zone Specifications on inputs Case studies

19 Schedule 15 November 2005, comments & contributions
15 December 2005, 4th draft guidance 18 January 2006, GWIII meeting in Frankfurt 31 January 2006, 5th draft guidance 13/14 February 2006, WG C meeting Brussels