Download presentation
Presentation is loading. Please wait.
Published byRut Bergman Modified over 6 years ago
1
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop VIA University College TCU-VIA Workshop 1
2
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Cheetah 1 (1.1) Aby 2 (1.2) Aimee 3 (1.3) Dora Bell Elisabeth Isabella Gregory Evelyn Jassica Wes Yogi Frank 4 (1.4) Allen 5 (1.5) Becker 6 (2.1) John Kevin Fitch Ron Herman Mark Slade Paul Wang 97 Bruce 7 (2.2) Caroline 8 (2.3) Circle ma 9 (2.4) Justin Lavine David Michael Poppy Jack 2 Peter Richard Petar Jack 1 10 (2.5) Rolam 11 (3.1) Alina 12 (3.2) Licha Rub Elsa Park Shirley Lancelot Reg Zoe Tina Alon 13 (3.3) Ann 14 (3.4) Foad 15 (3.5) Nate Gloria Kassa Pepper Kori Kid Aaron VIA University College TCU-VIA Workshop 2
3
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Time Presenting group Opponent group Time (minutes) Presenters Opponents Change + comments Thursday 1 - (1.1) 6 10 2 3 2 - (1.2) 7 3 - (1.3) 8 4 - (1.4) 9 5 - (1.5) Break 15 6 - (2.1) 11 7 - (2.2) 12 8 - (2.3) 13 9 - (2.4) 14 10 - (2.5) Friday 11 - (3.1) 1 12 - (3.2) 13 - (3.3) 14 - (3.4) 4 15 - (3.5) 5 VIA University College TCU-VIA Workshop 3
4
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop The exam is performed by presenting PPT in the classroom by each group The process for making your part (trade) of the house is to be showed as network diagram. An detailed explanation for which machines you will choose for your trade. Gantt diagram showing the time schedule for implement the multi storey building. A detailed construction site plan for your site including the needed equipment. Calculation and quantity take out for the multi storey house. A complete bidding form is filled out to the client with the final price for the project. The CM for your company is fixed to 10% on each sub contractor. Salary for 1 MH is fixed to 100 RMB Your group may need to corporate with some other groups to find all the prices. The PPT from each group must also be uploaded on the TCU-VIA platform. VIA University College TCU-VIA Workshop 4
5
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Your mark for the exams will be based on: 1) Language skills 2) Presentation 3) Overall comprehension of subjects 4) Attendance VIA University College TCU-VIA Workshop 5
6
Civil Engineering Construction Technology and Organization 1/2
Exam Civil Engineering Construction Technology and Organization 1/2 VIA / TCU 5th semester workshop Good luck VIA University College TCU-VIA Workshop 6
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.