Download presentation
Presentation is loading. Please wait.
1
WNG Closing Plenary Report
July 2002 WNG Closing Plenary Report Vancouver, BC July 2002 Bruce Kraemer, Intersil
2
Vancouver Objectives PStatus of SG spin outs
July 2002 Vancouver Objectives PStatus of SG spin outs Radio Resource Measurement High Throughput PUpdates from Bran #29, MMAC, IAG PInvitation to Host Joint WIG meeting in Monterey- Accepted PTwo Presentations on MAC efficiency PRadio Regulatory joint meeting PPremptive move to address Japanese band allocations PThe next priority discussions Bruce Kraemer, Intersil
3
July 2002 WIG Scope Draft proposal (The wording is by no means the final proposal) To be an integral part in the production of a generically applicable interworking standard for WWAN and other public networks. The standard is to be applicable for IEEE family, MMAC HiSWAN family, and ETSI HiperLAN/2 To be the point of resolution for ETSI, IEEE and MMAC on issues related to interworking with WWAN and other public networks. To be the single point of contact for the above mentioned WLAN standards on questions related to interworking with WWAN and other public networks. Bruce Kraemer, Intersil
4
WNG Objectives for Monterey
July 2002 WNG Objectives for Monterey Host WIG meeting as proposed by ETSI Facilitate PAR for adding Japanese 5 GHz bands Activity reports from ETSI, MMAC, IAG UWB Channel Model presentation from SG3A Discuss future WLAN directions & priorities Bruce Kraemer, Intersil
5
Key Presentations WNG Committee Report 02/468r1
July 2002 Key Presentations WNG Committee Report /468r1 WNG Closing Report /469 WIG Report /419 IAG Report Japanese Band /480 Yasuhiko Inoue, NTT /446r0 “Discussions on the Access Control Mechanisms for WLAN NG” Pek-Yew Tan, Panasonic 02/481r0 “Overheads in Data Streams over WLAN” Bruce Kraemer, Intersil
6
July 2002 Summary Make small changes to , .11a and .11d to meet Japan’s proposed regulatory requirements for low-band 4.9-5GHz operation PAR/5 Criterion preparation does not appear to warrant formation of a Study Group, but should developed to be submitted to the 802 exec before November 802 Plenary. Bruce Kraemer, Intersil
7
Approved unanimously: (90/0/0)
July 2002 The WNG Motion Move to investigate and to draft a PAR and Five Criteria to extend , a and d, as necessary, to the Japanese 4.9GHz-5GHz bands in the next ninety one days Approved unanimously: (90/0/0) Bruce Kraemer, Intersil
8
The WNG motion: to bring the following motion to the WG
July 2002 The WNG motion: to bring the following motion to the WG Move to empower WNG to investigate and draft a PAR and Five Criteria to extend , a and d, as necessary, to the Japanese 4.9GHz-5GHz bands, and after a Working Group confirming vote in the September interim meeting, empower the Working Group to forward them for approval at the November 2002 IEEE 802 Plenary Approved unanimously: (90/0/0) Bruce Kraemer, Intersil
9
End July 2002 Bruce Kraemer, Intersil doc.: IEEE 802.11-01/423r1
Al Petrick, Direct2Data Technologies
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.