1 Sewanee Civic Association
Elliott Park Concept

2 Three Options All Three Options Extremely Similar in Layout
Recommended Design Revised High End Design Revised Low End

3 Recommended Design

4 Recommended Themed Items Timbers/Nature Log Balance Beam
Stump and Rock Climber 3 Log Climber 4 Log Steppers 1 Mushroom Stepper Timbers/Nature 3’ Transfer Station 2 Slant Roofs on 6’ Decks 2 Step Link Transfer (1’ and 2’) 7 Enclosure Panels

5 High End Themed Items Timbers/Nature Enhanced Items Log Balance Beam
Stump and Rock Climber 3 Log Climber 5 Log Steppers 4 Mushroom Stepper Timbers/Nature 3’ Transfer Station 2 Gable Roofs on 6’ Decks 2 Step Link Transfer (1’ and 2’) 7 Enclosure Panels Enhanced Items 90 Degree Curved Bridge Tunnel Up Crawl Tube Conifer Climber (would like to add to recommended version) Double Bubble Climber Sun Blossom Panel Double Seat Seat and Table for 2

6 Low End Themed Items Timbers/Nature Major Changes 3 Log Climber N/A
Eliminated Roofs 100% metal and plastic with the exception of the 3 log climber In short, exactly what the group told me not to do

7 Preliminary Budget By Design
Recommended High Features Low Features Equipment $46,329 $54,655 $33,512 Installation $13,184 $15,598 $11,862 EWF $3,053 Freight $2,778 $3,156 $2,024 Total $65,345 $76,463 $50,452 Please consider these budget numbers. They should be very close to exact, pending freight changes and review of designs by engineering.


Download ppt "Sewanee Civic Association"