Improved Reliability through PM Optimisation
Project Team: Bob Andy Tony Paul Victor Facilitator: Peter Schurmann (OMCS International) Dryer Plant
2
Dryer Table of results Before and After (Labour hours per year)
Table indicates Actual Task Tool time only. Administration, preparation, cleanup and commissioning time is not included. This table has been prepared for the purpose of presentation only. The ratios will change when all aspects of the job are taken into consideration.
3
Improved Reliability through PM Optimisation
Project Team: Bob Colin Allan s Facilitator: Peter Schurmann (OMCS International) Recovery Plant
4
Recovery Table of results Before and After (Labour hours per year)
Table indicates Actual Task Tool time only. Administration, preparation, cleanup and commissioning time is not included. This table has been prepared for the purpose of presentation only. The ratios will change when all aspects of the job are taken into consideration.